EIA: Hydro-electric concession on the river Adda downstream of the new bridge on the SS 591 road

1376_Derivazione_idroelettrica_fiume_Adda

26/02/2015

The EIA procedure related to Hydro-electric concession on the river Adda downstream of the new bridge on the SS 591 road has been terminated on 26 February 2015 (determination DVA-2015-0005452).

Go to the project

Download decision