New electrical substation 380/150 kV of Vizzini, overhead 380/150 kV connections to the National Transmission Grid and related works

Documents

(n.3) Documents of the EIA Compliance

Title Section Code Date Scale Size
Decreto Direttoriale - Nuova stazione elettrica 380/150 kV di Vizzini con raccordi aerei 380/150 kV alla RTN ed opere connesse - Piano di Utilizzo Terre (PdU): Prescrizioni nn. 1 e 2 Determination DEC - 188 15/06/2021 - 227 kB Metadata Download
Allegato al Decreto Direttoriale - Parere CTVA del 17/05/2021 Determination PRR 256 15/06/2021 - 735 kB Metadata Download
Piano di Utilizzo Excavated material usage Plan RC17025BCSI01423-00-04 30/10/2020 - 50114 kB Metadata Download