Environmental Assessments and Authorizations: SEA - EIA - IPPC Permit

You are in:

Structural works of hydraulic safety and supply of drinking water in Gello and Laghi Primavera (PT)


General information

Work: Structural works of hydraulic safety and supply of drinking water in Gello and Laghi Primavera (PT)

Project: Structural works of hydraulic safety and supply of drinking water in Gello and Laghi Primavera (PT)

Description: The project involves changes to the project already object of positive assessment of environmental compatibility (26/06/2009), in particular as regards the lowering of the top of the dam Gello and environmental operations for the accessibility of the area Laghi Primavera.

Developer: Comune di Pistoia

Project type: Hydraulic works

Deadline for submission of comments: 29/12/2014 mail

Territories and marine areas

Regions: Toscana

Provinces: Pistoia

Municipalities: Pistoia

Marine areas: None

Select procedure

Procedure Online application code Procedure Code Starting date Stage of the procedure
EIA Screening 2886 13/11/2014 Concluded Procedure details Documents
Environmental Impact Assessment 1625 27/06/2007 Concluded Procedure details Documents