Environmental Assessments and Authorizations: SEA - EIA - IPPC Permit

You are in:

"Ripalta Storage" Concession - Expansion of the storage capacity by increasing the maximum operating pressure (Pmax) over the original bottom static pressure (Pi) of the reservoir (Pmax = 1.10 Pi) and the withdrawal peak capacity , through the implementation of a new treatment plant, the drilling of four new wells and the construction of the infrastructures required


General information

Work: Storage concession Ripalta

Project: "Ripalta Storage" Concession - Expansion of the storage capacity by increasing the maximum operating pressure (Pmax) over the original bottom static pressure (Pi) of the reservoir (Pmax = 1.10 Pi) and the withdrawal peak capacity , through the implementation of a new treatment plant, the drilling of four new wells and the construction of the infrastructures required

Description: The project involves an increase in storage capacity through the exercise of the storage under pressure not exceeding 110% of the original bottom static pressure of the reservoir (Pi), the construction of a new gas processing plant with a capacity of 35 MSm3/d, the drilling of four new wells for injection/ withdrawal (Ripalta 64dir, 65Or, 66Or and 67Or) and the construction of some complementary infrastructures.

Developer: STOGIT S.p.A.

Project type: Storage facilities

Related website: Ministero dello Sviluppo Economico

Territories and marine areas

Map

Regions: Lombardia

Provinces: Cremona

Municipalities: Castelleone, Ripalta Arpina, Ripalta Guerina, Ripalta Cremasca

Marine areas: None

Select procedure

Procedure Online application code Procedure Code Starting date Stage of the procedure
Environmental Impact Assessment 9073 31/03/2022 Concluded Procedure details Documents
EIA Compliance 3904 16/01/2018 Concluded Procedure details Documents
Environmental Impact Assessment 2073 09/10/2012 Concluded Procedure details Documents