Changing the emergency flashlights system and safety of production facilities of the Basell Poliolefine Italia S.r.l. plant of Ferrara


General information

Work: Basell Poliolefine Italia S.r.l. plant of Ferrara

Project: Changing the emergency flashlights system and safety of production facilities of the Basell Poliolefine Italia S.r.l. plant of Ferrara

Description: Construction of a Catenary Anchor Line Mooring (CALM) off-shore terminal for crude oil transfer from tankers to land, off the outer breakwater in front of the airport of Genoa. The project involves a buoy anchored to the bottom of the sea, located about 3 km away from the Oil Terminal, a submarine PLEM for valves location, two subsea pipelines about 3.3 km long. The project also provides for disposal of the existing off-shore system, located off the outer breakwater and close to the new facilities.

Developer: Basell Poliolefine Italia S.r.l.

Project type: Integrated chemical plants

Related website: Procedura integrata VIA-AIA: documentazione AIA

Territories and marine areas

Map

Regions: Emilia Romagna

Provinces: Ferrara

Municipalities: Ferrara

Marine areas: None

Select procedure

Procedure Online application code Procedure Code Starting date Stage of the procedure
EIA Compliance 3006 24/04/2015 Concluded Procedure details Documents
Environmental Impact Assessment 2353 21/05/2013 Concluded Procedure details Documents