Work: Basell Poliolefine Italia S.r.l. plant of Ferrara
Project: Changing the emergency flashlights system and safety of production facilities of the Basell Poliolefine Italia S.r.l. plant of Ferrara
Description: Construction of a Catenary Anchor Line Mooring (CALM) off-shore terminal for crude oil transfer from tankers to land, off the outer breakwater in front of the airport of Genoa. The project involves a buoy anchored to the bottom of the sea, located about 3 km away from the Oil Terminal, a submarine PLEM for valves location, two subsea pipelines about 3.3 km long. The project also provides for disposal of the existing off-shore system, located off the outer breakwater and close to the new facilities.
Developer: Basell Poliolefine Italia S.r.l.
Project type: Integrated chemical plants
Related website: Procedura integrata VIA-AIA: documentazione AIA
Regions: Emilia Romagna
Provinces: Ferrara
Municipalities: Ferrara
Marine areas: None
Procedure | Online application code | Procedure Code | Starting date | Stage of the procedure | ||
---|---|---|---|---|---|---|
EIA Compliance | 3006 | 24/04/2015 | Concluded | Procedure details | Documents | |
Environmental Impact Assessment | 2353 | 21/05/2013 | Concluded | Procedure details | Documents |