EIA Compliance |
11359 |
22/04/2024 |
Administrative control |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
11359 |
Subject
: |
Istruttoria VIA. "Interconnessione a 150kV Sorrento - Vico Equense - Agerola - Lettere ed opere connesse". - Prescrizione: A.17 |
Date of application submission: |
22/04/2024 |
Responsible of the procedure: |
Claudia Pieri - tel. 0657225071 - 0657225070 - va-5@mite.gov.it |
Stage of the Procedure: |
Administrative control |
Environmental Impact Assessment |
10599 |
28/11/2023 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
10599 |
Subject
: |
Elettrodotto di interconnessione misto aereo-cavo-interrato a 150kV "Sorrento - Vico Equense - Agerola - Lettere" Richiesta di proroga della Compatibilità Ambientale rilasciata con Decreto D.M. 139 del 01.06.2017 |
Date of application submission: |
28/11/2023 |
Date of the Opinion of the National Technical Commission : |
29/01/2024 |
National Technical Commission Opinion number: |
543 |
National Technical Commission Opinion outcome: |
Positivo |
Ministry of Cultural Heritage and Tourism Opinion date: |
29/02/2024 |
Ministry of Cultural Heritage and Activities and Tourism Opinion date: |
MASE_2024-0039657 |
Ministry of Cultural Heritage and Activities and Tourism Opinion date: |
Positivo |
Date of the EIA Decree: |
23/04/2024 |
EIA Decree number: |
DM_2024-0000128 |
EIA Decree outcome: |
Positivo |
Responsible of the procedure: |
Claudia Pieri - tel. 0657225071 - 0657225070 - va-5@mite.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
9662 |
08/03/2023 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
9662 |
Subject
: |
Istruttoria VIA. "Interconnessione a 150kV Sorrento - Vico Equense - Agerola - Lettere ed opere connesse". - Prescrizione: A.17 |
Date of application submission: |
08/03/2023 |
Technical assessment starting date: |
08/05/2023 |
Date of the Opinion of the National Technical Commission : |
03/07/2023 |
National Technical Commission Opinion number: |
788 |
National Technical Commission Opinion outcome: |
Parzialmente ottemperata |
Determination date: |
25/07/2023 |
Determination number: |
MASE-VA-DEC-2023-0000357 |
Determination outcome: |
Parzialmente ottemperata |
Notification date: |
09/08/2023 |
Notification Reference number: |
MASE_2023-0131342 |
Responsible of the procedure: |
Claudia Pieri - tel. 0657225071 - 0657225070 - va-5@mite.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
9664 |
01/03/2023 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
9664 |
Subject
: |
"Interconnessione a 150kV Sorrento - Vico Equense - Agerola - Lettere ed opere connesse". (tratti di elettrodotto in aereo del progetto) - Prescrizione: A.13 |
Date of application submission: |
01/03/2023 |
Technical assessment starting date: |
06/04/2023 |
Determination date: |
10/08/2023 |
Determination number: |
MASE_VA_DEC_2023-0000386 |
Determination outcome: |
Ottemperata |
Notification date: |
07/09/2023 |
Notification Reference number: |
MASE-2023-0141490 |
Responsible of the procedure: |
Claudia Pieri - tel. 0657225071 - 0657225070 - va-5@mite.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
6259 |
26/01/2022 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
6259 |
Subject
: |
Istruttoria VIA. "Interconnessione a 150kV Sorrento - Vico Equense - Agerola - Lettere ed opere connesse". - Prescrizione: A.15 |
Date of application submission: |
26/01/2022 |
Technical assessment starting date: |
03/02/2022 |
Communication date of the outcome to the developer: |
01/02/2024 |
Protocol of outcome communication to the developer: |
MASE_2024-0018337 |
Outcome: |
parzialmente ottemperata |
Responsible of the procedure: |
Claudia Pieri - tel. 0657225071 - 0657225070 - va-5@mite.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
7600 |
22/11/2021 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
7600 |
Subject
: |
"Interconnessione a 150kV Sorrento - Vico Equense - Agerola - Lettere ed opere connesse". - Prescrizioni: A.12, A.19 |
Date of application submission: |
22/11/2021 |
Date of request for documents perfection : |
06/12/2021 |
Date of perfection proceedings documents receipt: |
04/01/2022 |
Technical assessment starting date: |
11/02/2022 |
Date of the Opinion of the National Technical Commission : |
22/07/2022 |
National Technical Commission Opinion number: |
524 |
National Technical Commission Opinion outcome: |
Ottemperata |
Determination date: |
22/08/2022 |
Determination number: |
MiTE_VA_DEC_2022-0000202 |
Determination outcome: |
Ottemperata |
Notification date: |
25/08/2022 |
Notification Reference number: |
MiTE_2022-0103543 |
Responsible of the procedure: |
Claudia Pieri - tel. 0657225071 - 0657225070 - va-5@mite.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
7575 |
04/11/2021 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
7575 |
Subject
: |
"Interconnessione a 150kV Sorrento - Vico Equense - Agerola - Lettere ed opere connesse". - Prescrizione: A.25 |
Date of application submission: |
04/11/2021 |
Determination date: |
25/11/2021 |
Determination number: |
MATTM_DEC_2021-0000458 |
Determination outcome: |
Ottemperata |
Notification date: |
29/11/2021 |
Notification Reference number: |
MATTM-2021-0133028 |
Responsible of the procedure: |
Claudia Pieri - tel. 0657225071 - 0657225070 - va-5@mite.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
6254 |
21/10/2021 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
6254 |
Subject
: |
Istruttoria VIA. "Interconnessione a 150kV Sorrento - Vico Equense - Agerola - Lettere ed opere connesse". - Prescrizioni: A.10, A.7, A.9 |
Date of application submission: |
21/10/2021 |
Date of the Opinion of the National Technical Commission : |
08/11/2021 |
National Technical Commission Opinion number: |
378 |
National Technical Commission Opinion outcome: |
ottemperata |
Determination date: |
08/06/2022 |
Determination number: |
MiTE_VA_DEC_2022-0000088 |
Determination outcome: |
Ottemperata |
Notification date: |
10/06/2022 |
Notification Reference number: |
MiTE-2022-0072756 |
Responsible of the procedure: |
Claudia Pieri - tel. 0657225071 - 0657225070 - va-5@mite.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
7511 |
11/10/2021 |
Administrative control |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
7511 |
Date of application submission: |
11/10/2021 |
Stage of the Procedure: |
Administrative control |
EIA Compliance |
6215 |
22/09/2021 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
6215 |
Subject
: |
"Interconnessione a 150kV Sorrento - Vico Equense - Agerola - Lettere ed opere connesse". - Prescrizione: A.8 |
Date of application submission: |
22/09/2021 |
Date of the Opinion of the National Technical Commission : |
08/11/2021 |
National Technical Commission Opinion number: |
377 |
National Technical Commission Opinion outcome: |
Non ottemperata |
Determination date: |
22/11/2021 |
Determination number: |
MATTM_DEC_2021-0000447 |
Determination outcome: |
Non ottemperata |
Notification date: |
14/06/2022 |
Notification Reference number: |
MiTE-2022-0074459 |
Responsible of the procedure: |
Claudia Pieri - tel. 0657225071 - 0657225070 - va-5@mite.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
4855 |
10/08/2021 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
4855 |
Subject
: |
Istruttoria VIA. "Interconnessione a 150kV Sorrento - Vico Equense - Agerola - Lettere ed opere connesse". - Prescrizione: A.3 |
Date of application submission: |
10/08/2021 |
Technical assessment starting date: |
23/08/2021 |
Date of the Opinion of the National Technical Commission : |
25/02/2022 |
National Technical Commission Opinion number: |
429 |
National Technical Commission Opinion outcome: |
Ottemperata |
Determination date: |
21/04/2022 |
Determination number: |
MiTE_VA_DEC_2022-0000039 |
Determination outcome: |
Ottemperata |
Notification date: |
06/05/2022 |
Notification Reference number: |
MiTE-2022-0056494 |
Responsible of the procedure: |
Claudia Pieri - tel. 0657225071 - 0657225070 - va-5@mite.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
5936 |
26/07/2021 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
5936 |
Subject
: |
Istruttoria VIA. "Interconnessione a 150kV Sorrento - Vico Equense - Agerola - Lettere ed opere connesse". - Prescrizione: A.13 |
Date of application submission: |
26/07/2021 |
Technical assessment starting date: |
06/08/2021 |
Date of the Opinion of the National Technical Commission : |
26/04/2022 |
National Technical Commission Opinion number: |
475 |
National Technical Commission Opinion outcome: |
Parzialmente Ottemperata |
Determination date: |
18/05/2022 |
Determination number: |
MiTE_VA_DEC_2022-0000063 |
Determination outcome: |
Parzialmente Ottemperata |
Notification date: |
24/05/2022 |
Notification Reference number: |
MiTE-2022-0064971 |
Responsible of the procedure: |
Claudia Pieri - tel. 0657225071 - 0657225070 - va-5@mite.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
5887 |
12/07/2021 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
5887 |
Subject
: |
Istruttoria VIA. "Interconnessione a 150kV Sorrento - Vico Equense - Agerola - Lettere ed opere connesse". - Prescrizione: A.11 |
Date of application submission: |
12/07/2021 |
Technical assessment starting date: |
20/07/2021 |
Date of the Opinion of the National Technical Commission : |
13/04/2022 |
National Technical Commission Opinion number: |
470 |
National Technical Commission Opinion outcome: |
Ottemperata |
Determination date: |
18/05/2022 |
Determination number: |
MiTE-VA-DEC-2022-0000064 |
Determination outcome: |
Ottemperata |
Notification date: |
24/05/2022 |
Notification Reference number: |
MiTE-2022-0064955 |
Responsible of the procedure: |
Claudia Pieri - tel. 0657225071 - 0657225070 - va-5@mite.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
6095 |
30/06/2021 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
6095 |
Subject
: |
Istruttoria VIA. "Interconnessione a 150kV Sorrento - Vico Equense - Agerola - Lettere ed opere connesse". - Prescrizione: A.6 |
Date of application submission: |
30/06/2021 |
Technical assessment starting date: |
05/07/2021 |
Date of the Opinion of the National Technical Commission : |
29/11/2021 |
National Technical Commission Opinion number: |
390 |
National Technical Commission Opinion outcome: |
Positivo |
Determination date: |
27/05/2022 |
Determination number: |
MiTE_VA_DEC_2022-0000073 |
Determination outcome: |
Ottemperata |
Notification date: |
30/05/2022 |
Notification Reference number: |
MiTE_2022-0067717 |
Responsible of the procedure: |
Claudia Pieri - tel. 0657225071 - 0657225070 - va-5@mite.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
5987 |
01/06/2021 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
5987 |
Subject
: |
Istruttoria VIA. "Interconnessione a 150kV Sorrento - Vico Equense - Agerola - Lettere ed opere connesse". - Prescrizioni: A.2.c, A.2.d, A.2.e |
Date of application submission: |
01/06/2021 |
Technical assessment starting date: |
24/09/2021 |
Date of the Opinion of the National Technical Commission : |
18/10/2021 |
National Technical Commission Opinion number: |
351 |
National Technical Commission Opinion outcome: |
Ottemperata |
Determination date: |
08/11/2021 |
Determination number: |
MATTM_DEC_2021-0000422 |
Determination outcome: |
Ottemperata |
Notification date: |
10/11/2021 |
Notification Reference number: |
MATTM_2021-0122623 |
Responsible of the procedure: |
Claudia Pieri - tel. 0657225071 - 0657225070 - va-5@mite.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
4987 |
26/05/2021 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
4987 |
Subject
: |
Istruttoria VIA. "Interconnessione a 150kV Sorrento - Vico Equense - Agerola - Lettere ed opere connesse". - Prescrizione: A.4 |
Date of application submission: |
26/05/2021 |
Technical assessment starting date: |
11/06/2021 |
Date of the Opinion of the National Technical Commission : |
07/03/2022 |
National Technical Commission Opinion number: |
443 |
National Technical Commission Opinion outcome: |
Ottemperata |
Determination date: |
21/04/2022 |
Determination number: |
MiTE_VA_DEC_2022-0000038 |
Determination outcome: |
Ottemperata |
Notification date: |
06/05/2022 |
Notification Reference number: |
MiTE-2022-0056466 |
Responsible of the procedure: |
Claudia Pieri - tel. 0657225071 - 0657225070 - va-5@mite.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
6085 |
05/05/2021 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
6085 |
Subject
: |
Istruttoria VIA. "Interconnessione a 150kV Sorrento - Vico Equense - Agerola - Lettere ed opere connesse". - Prescrizioni: A.2.a, A.2.b, A.2.c, A.2.d, A.2.e, A.2.f |
Date of application submission: |
05/05/2021 |
Date of the Opinion of the National Technical Commission : |
29/11/2021 |
National Technical Commission Opinion number: |
389 |
National Technical Commission Opinion outcome: |
Ottemperata |
Determination date: |
16/12/2021 |
Determination number: |
MATTM_DEC_2021-0000532 |
Determination outcome: |
Ottemperata |
Notification date: |
20/12/2021 |
Notification Reference number: |
MATTM-2021-0142578 |
Responsible of the procedure: |
Claudia Pieri - tel. 0657225071 - 0657225070 - va-5@mite.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
6061 |
22/04/2021 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
6061 |
Subject
: |
Istruttoria VIA. "Interconnessione a 150kV Sorrento - Vico Equense - Agerola - Lettere ed opere connesse". - Prescrizione: A.16 VIA |
Date of application submission: |
22/04/2021 |
Technical assessment starting date: |
07/05/2021 |
Date of the Opinion of the National Technical Commission : |
07/03/2022 |
National Technical Commission Opinion number: |
447 |
National Technical Commission Opinion outcome: |
Ottemperata |
Determination date: |
04/04/2022 |
Determination number: |
MiTE_VA_DEC_2022-0000032 |
Determination outcome: |
Ottemperata |
Notification date: |
06/05/2022 |
Notification Reference number: |
MiTE-2022-0056473 |
Responsible of the procedure: |
Claudia Pieri - tel. 0657225071 - 0657225070 - va-5@mite.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
5965 |
25/03/2021 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
5965 |
Subject
: |
Istruttoria VIA. "Interconnessione a 150kV Sorrento - Vico Equense - Agerola - Lettere ed opere connesse". - Prescrizione: B.6 |
Date of application submission: |
25/03/2021 |
Communication date of the outcome to the developer: |
14/10/2021 |
Protocol of outcome communication to the developer: |
MATTM_2021-0110774 |
Outcome: |
Ottemperata |
Responsible of the procedure: |
Claudia Pieri - tel. 0657225071 - 0657225070 - va-5@mite.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
5714 |
03/02/2021 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
5714 |
Subject
: |
Istruttoria VIA. "Interconnessione a 150kV Sorrento - Vico Equense - Agerola - Lettere ed opere connesse". - Prescrizione: A.15 |
Date of application submission: |
03/02/2021 |
Technical assessment starting date: |
08/02/2021 |
Date of notification to the developer of the procedure outcomes: |
18/03/2021 |
Date of the Opinion of the National Technical Commission : |
05/03/2021 |
National Technical Commission Opinion number: |
195 |
National Technical Commission Opinion outcome: |
Ottemperata |
Determination date: |
16/03/2021 |
Determination number: |
MATTM_DEC_2021-0000081 |
Determination outcome: |
Ottemperata |
Notification Reference number: |
MATTM-2021-0028544 |
Outcome: |
Ottemperata |
Responsible of the procedure: |
Claudia Pieri - tel. 0657225071 - 0657225070 - va-5@mite.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
5255 |
20/01/2021 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
5255 |
Subject
: |
Progetto "Interconnessione a 150kV Sorrento - Vico Equense - Agerola - Lettere ed opere connesse". Prescrizione: A.2, limitatamente ai tratti di elettrodotti in cavo interrato |
Date of application submission: |
20/01/2021 |
Date of request for documents perfection : |
27/09/2022 |
Date of perfection proceedings documents receipt: |
10/10/2022 |
Technical assessment starting date: |
02/02/2021 |
Date of notification to the developer of the procedure outcomes: |
19/03/2021 |
Date of the Opinion of the National Technical Commission : |
26/02/2021 |
National Technical Commission Opinion number: |
192 |
National Technical Commission Opinion outcome: |
Parzialmente ottemperata |
Determination date: |
17/03/2021 |
Determination number: |
MATTM_DEC_2021-0000088 |
Determination outcome: |
Parzialmente ottemperata |
Notification date: |
19/03/2021 |
Notification Reference number: |
MATTM_2021-0029134 |
Communication date of the outcome to the developer: |
25/10/2022 |
Protocol of outcome communication to the developer: |
MiTE_2022-0132588 |
Outcome: |
Parzialmente ottemperata |
Responsible of the procedure: |
Claudia Pieri - tel. 0657225071 - 0657225070 - va-5@mite.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
5215 |
14/04/2020 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
5215 |
Subject
: |
Interconnessione a 150kV Sorrento-Vico Equense-Agerola-Lettere ed opere connesse |
Date of application submission: |
14/04/2020 |
Technical assessment starting date: |
24/04/2020 |
Date of notification to the developer of the procedure outcomes: |
18/03/2021 |
Date of the Opinion of the National Technical Commission : |
26/02/2021 |
National Technical Commission Opinion number: |
193 |
National Technical Commission Opinion outcome: |
Ottemperata |
Determination date: |
15/03/2021 |
Determination number: |
MATTM_DEC_2021-0000077 |
Determination outcome: |
Ottemperata |
Notification Reference number: |
MATTM-2021-0028547 |
Outcome: |
Ottemperata |
Responsible of the procedure: |
Claudia Pieri - tel. 0657225071 - 0657225070 - va-5@mite.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
3772 |
23/10/2017 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3772 |
Subject
: |
Prescrizione A.1 del Decreto VIA n. 139 del 01/06/2017 |
Date of application submission: |
23/10/2017 |
Technical assessment starting date: |
06/11/2017 |
Date of the Opinion of the National Technical Commission : |
02/03/2018 |
National Technical Commission Opinion number: |
2660 |
National Technical Commission Opinion outcome: |
Ottemperata |
Determination date: |
06/03/2018 |
Determination number: |
DVA-DEC-2018-0000107 |
Determination outcome: |
Ottemperata |
Responsible of the procedure: |
Antonio Venditti - tel. 0657225071 - 0657225070 - va-5@mite.gov.it |
Stage of the Procedure: |
Concluded |
Environmental Impact Assessment |
2566 |
17/10/2013 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
2566 |
EIA-AA integrated Procedure : |
Sì |
Subject
: |
"Interconnessione a 150kV Sorrento - Vico Equense - Agerola - Lettere ed opere connesse". (tratti di elettrodotto in aereo del progetto) - Prescrizione: A.13 |
Date of application submission: |
17/10/2013 |
Publication date of the notice in newspapers: |
16/10/2013 |
Deadline of submission of Public Comments: |
16/12/2013 |
Technical assessment starting date: |
28/10/2013 |
Date of integrations receipt: |
09/12/2014 |
Republication date of the notice in newspapers: |
09/02/2015 |
Deadline of submission of Public Comments on the republished project: |
10/04/2015 |
Date of request for integrations for the republished project: |
18/05/2016 |
Date of the Opinion of the National Technical Commission : |
24/02/2017 |
National Technical Commission Opinion number: |
2315 |
National Technical Commission Opinion outcome: |
Positivo con prescrizioni |
Date of the EIA Decree: |
01/06/2017 |
EIA Decree number: |
DM-0000139 |
EIA Decree outcome: |
Positivo con prescrizioni |
Notes: |
Il Parere n.2315 del 24/02/2017 annulla e sostituisce il Parere n.2166 del 23/09/2016. Il Parere n.2314 del 24/02/2017 modifica le prescrizioni 14 e 19 del Parere n.2166 del 23/09/2016. Il Parere n.2313 del 24/02/2017 modifica la prescrizione 2 del Parere n.2166 del 23/09/2016Con nota del 16/06/2016 (prot. DVA-2016-0015993) è stata concessa una sospensione del procedimento di 30 giorni. |
Responsible of the procedure: |
Claudia Pieri - tel. 0657225071 - 0657225070 - va-5@mite.gov.it |
Stage of the Procedure: |
Concluded |