Environmental Assessments and Authorizations: SEA - EIA - IPPC Permit

You are in:

Rationalization of the150 kV electricity grid in the province of Messina


General information

Work: 150 kV electricity grid in the province of Messina

Project: Rationalization of the150 kV electricity grid in the province of Messina

Description: The rationalization of the150 kV electricity grid in the province of Messina involves the construction of the 150 kV overhead connection PS Villafranca - PS Pace del Mela 2,18 km long, of the 150 kV overhead connection PS San Cosimo - PS Messina Riviera 2,58 km long, of the 150 kV underground power line PS Contesse - PS Contesse RFI 1,76 km long and the demolition of about 50 km of existing power lines.

Developer: Terna S.p.A.

Project type: Electrical power lines

Deadline for submission of comments: 04/02/2017 mail

Territories and marine areas

Map

Regions: Sicilia

Provinces: Messina

Municipalities: Messina, Saponara, Villafranca Tirrena

Marine areas: None

Select procedure

Procedure Online application code Procedure Code Starting date Stage of the procedure
EIA Screening 3510 20/12/2016 Concluded Procedure details Documents