Work: 150 kV electricity grid in the province of Messina
Project: Rationalization of the150 kV electricity grid in the province of Messina
Description: The rationalization of the150 kV electricity grid in the province of Messina involves the construction of the 150 kV overhead connection PS Villafranca - PS Pace del Mela 2,18 km long, of the 150 kV overhead connection PS San Cosimo - PS Messina Riviera 2,58 km long, of the 150 kV underground power line PS Contesse - PS Contesse RFI 1,76 km long and the demolition of about 50 km of existing power lines.
Developer: Terna S.p.A.
Project type: Electrical power lines
Deadline for submission of comments: 04/02/2017 mail
Regions: Sicilia
Provinces: Messina
Municipalities: Messina, Saponara, Villafranca Tirrena
Marine areas: None
Procedure | Online application code | Procedure Code | Starting date | Stage of the procedure | ||
---|---|---|---|---|---|---|
EIA Screening | 3510 | 20/12/2016 | Concluded | Procedure details | Documents |