Environmental Assessments and Authorizations: SEA - EIA - IPPC Permit

You are in:

Gas pipeline "Natural gas transport system in the center and north of the Sardinia"


General information

Work: Gas pipeline "Natural gas transport system in the center and north of the Sardinia"

Project: Gas pipeline "Natural gas transport system in the center and north of the Sardinia"

Description: The project involves the construction of a pipeline of 208 km long in the center and north of the Sardinia. The gas pipeline route includes the laying of the DN 400 DP 75 gas pipeline from Porto Torres to Codrogionas 50,4 km long, the DN 400 DP 75 gas pipeline from Codrogionas to Palmas Arborea 101,7 km long, the Sassari connection pipeline of 4,7 km length and the gas pipeline Ottana - Nuoro with a length of 51,3 km.

Developer: Società Gasdotti Italia S.p.A

Project type: Natural gas pipelines

Territories and marine areas

Map

Regions: Sardegna

Provinces: Sassari, Nuoro, Oristano

Municipalities: Noragugume, Cargeghe, Ottana, Torralba, Muros, Ossi, Orani, Giave, Bonnanaro, Oristano, Oniferi, Dualchi, Macomer, Zerfaliu, Usini, Abbasanta, Sindia, Nuoro, Simaxis, Pozzomaggiore, Porto Torres, Sassari, Borore, Paulilatino, Palmas Arborea, Siligo, Cheremule, Tissi, Codrongianos, Norbello, Ollastra, Cossoine, Bolotana, Villanova Truschedu

Marine areas: None

Select procedure

Procedure Procedure Code Starting date Stage of the procedure
Environmental Impact Assessment 3698 15/09/2017 Concluded Procedure details Documents