Work: "Forentum" on-shore wind farm
Project: 39.6 MW onshore wind farm "Forentum" in the municipality of Lavello (PZ) - Spostamento stazione utenza, cabina smistamento e 1 aerogeneratore
Developer: BEL LAVELLO VI. GI. S.r.l.
Project type: Onshore wind farm
Other projects related to the same work: Show / Hide
Regions: Basilicata
Provinces: Potenza
Municipalities: Lavello
Marine areas: None
Procedure | Online application code | Procedure Code | Starting date | Stage of the procedure | ||
---|---|---|---|---|---|---|
Preliminary assessment | 4058 | 10/04/2018 | Concluded | Procedure details | Documents |