Environmental Assessments and Authorizations: SEA - EIA - IPPC Permit

You are in:

39.6 MW onshore wind farm "Forentum" in the municipality of Lavello (PZ) - Spostamento stazione utenza, cabina smistamento e 1 aerogeneratore


General information

Work: "Forentum" on-shore wind farm

Project: 39.6 MW onshore wind farm "Forentum" in the municipality of Lavello (PZ) - Spostamento stazione utenza, cabina smistamento e 1 aerogeneratore

Developer: BEL LAVELLO VI. GI. S.r.l.

Project type: Onshore wind farm

Other projects related to the same work: Show / Hide

Territories and marine areas

Regions: Basilicata

Provinces: Potenza

Municipalities: Lavello

Marine areas: None

Select procedure

Procedure Online application code Procedure Code Starting date Stage of the procedure
Preliminary assessment 4058 10/04/2018 Concluded Procedure details Documents