IPPC permit for non substantial changes |
|
82/16803 |
09/08/2024 |
on-going procedure |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
82/16803 |
Reference of previous authorization's Act: |
D.M. n. 172 del 11/05/2018 modificato con DM 78 del 03/03/2021 e DEC MIN 7 del 11/01/2022 |
Application submission date: |
08/08/2024 |
Ministry Protocol Application submission: |
prot. MASE/149766 |
Ministry Protocol date of application submission: |
09/08/2024 |
Subject: |
installazione di sezione di finissaggio delle acque provenienti dalle unità SWS |
Procedure starting date : |
22/08/2024 |
Launch of public consultation: |
22/08/2024 |
Deadline of submission of Public Comments on IPPC permit: |
21/09/2024 |
Stage of the Procedure: |
on-going procedure |
IPPC permit for non substantial changes |
|
82/16759 |
01/08/2024 |
on-going procedure |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
82/16759 |
Reference of previous authorization's Act: |
DEC MIN 7 del 11/01/2022 |
Application submission date: |
31/07/2024 |
Ministry Protocol Application submission: |
prot. MASE/143864. |
Ministry Protocol date of application submission: |
01/08/2024 |
Subject: |
modifica non sostanziale |
Procedure starting date : |
12/08/2024 |
Launch of public consultation: |
12/08/2024 |
Deadline of submission of Public Comments on IPPC permit: |
11/09/2024 |
Stage of the Procedure: |
on-going procedure |
IPPC permit’s reconsideration |
|
82/15270 |
09/11/2023 |
IPPC Technical Committee's assessment |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
82/15270 |
Ministry Protocol date of application submission: |
09/11/2023 |
Procedure starting date : |
09/11/2023 |
Launch of public consultation: |
09/11/2023 |
Deadline of submission of Public Comments on IPPC permit: |
09/12/2023 |
Stage of the Procedure: |
IPPC Technical Committee's assessment |
IPPC permit’s reconsideration |
|
82/14341 |
07/04/2023 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
82/14341 |
Reference of previous authorization's Act: |
DEC MIN 7 del 11/01/2022 |
Ministry Protocol date of application submission: |
07/04/2023 |
Subject: |
riesame parziale |
Procedure starting date : |
12/04/2023 |
Launch of public consultation: |
12/04/2023 |
Deadline of submission of Public Comments on IPPC permit: |
12/05/2023 |
Decision Number: |
DM 348 |
Decision Date: |
24/10/2023 |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
|
82/12529 |
17/03/2022 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
82/12529 |
Reference of previous authorization's Act: |
D.M. 7 del 2022 |
Application submission date: |
17/03/2022 |
Ministry Protocol Application submission: |
MITE-2022-36836 |
Ministry Protocol date of application submission: |
22/03/2022 |
Subject: |
Istanza di modifica relativa alla linea di adduzione di idrogeno agli impianti zolfo a servizio della Raffineria al fine di migliorare le prestazioni del sistema complessivo attualmente esistente |
Procedure starting date : |
28/03/2022 |
Decision Number: |
Nota prot. MITE - 2022 - 083526 |
Decision Date: |
05/07/2022 |
Decisions' Outcome: |
positivo |
Stage of the Procedure: |
Concluded |
IPPC permit’s reconsideration |
|
82/11106 |
30/11/2020 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
82/11106 |
Reference of previous authorization's Act: |
D.M. 172/2018 |
Ministry Protocol date of application submission: |
30/11/2020 |
Subject: |
riesame parziale dell'Autorizzazione Integrata Ambientale rilasciata con D.M. n. 172 del 11/05/2018 |
Decision Number: |
DM 07 del 11/01/2022 |
Decision Date: |
11/01/2022 |
Decisions' Outcome: |
positivo |
Date of notification to the developer of the procedure outcomes: |
19/01/2022 |
Notification Reference number: |
MITE-2022-5461 |
Outcome: |
positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for substantial changes |
|
82/9976 |
25/01/2019 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
82/9976 |
Reference of previous authorization's Act: |
D.M. 172/2018 |
Ministry Protocol date of application submission: |
25/01/2019 |
Subject: |
Riesame parziale dell'AIA per adeguamento del quadro normativo a seguito dell'adozione del Piano Regionale di Tutela dellaQualità dell'Aria in Sicilia |
Procedure starting date : |
20/02/2019 |
Launch of public consultation: |
11/03/2019 |
Deadline of submission of Public Comments on IPPC permit: |
10/04/2019 |
Decision Number: |
DM 78 |
Decision Date: |
03/03/2021 |
Decisions' Outcome: |
Positivo |
Date of notification to the developer of the procedure outcomes: |
31/03/2021 |
Notification Reference number: |
33537 |
Outcome: |
positivo |
Stage of the Procedure: |
Concluded |
IPPC permit’s reconsideration |
|
82/1086 |
04/08/2016 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
82/1086 |
Application submission date: |
25/07/2016 |
Ministry Protocol Application submission: |
20234/DVA |
Ministry Protocol date of application submission: |
02/08/2016 |
Procedure starting date : |
04/08/2016 |
Decision Number: |
DM 172 |
Decision Date: |
11/05/2018 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
IPPC permit’s reconsideration |
|
82/1057 |
15/04/2016 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
82/1057 |
Application submission date: |
08/04/2016 |
Ministry Protocol Application submission: |
Decreto 129/DVA |
Ministry Protocol date of application submission: |
08/04/2016 |
Subject: |
Riesame complessivo |
Procedure starting date : |
15/04/2016 |
Decision Number: |
D.M. 172 |
Decision Date: |
11/05/2018 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
IPPC permit’s reconsideration |
|
82/1053 |
25/03/2016 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
82/1053 |
Application submission date: |
17/03/2016 |
Ministry Protocol Application submission: |
7389/DVA |
Ministry Protocol date of application submission: |
17/03/2016 |
Subject: |
Copertura vasche API dell'impianto trattamento acque sezioni TAP e TAZ |
Procedure starting date : |
25/03/2016 |
Decision Number: |
D.M. 33 |
Decision Date: |
15/02/2017 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
IPPC permit’s reconsideration |
|
82/982 |
08/03/2016 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
82/982 |
Application submission date: |
04/01/2016 |
Ministry Protocol Application submission: |
582 |
Ministry Protocol date of application submission: |
13/01/2016 |
Subject: |
Relazione di Riferimento |
Procedure starting date : |
08/03/2016 |
Decision Number: |
30767/DVA |
Decision Date: |
21/12/2016 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit for substantial changes |
|
82/878 |
16/03/2015 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
82/878 |
Application submission date: |
23/02/2015 |
Ministry Protocol Application submission: |
DVA-2015-0004976 |
Ministry Protocol date of application submission: |
20/02/2015 |
Subject: |
Richieste di deroghe previste dalla parte V dell'allegato II parte I per gli impianti anteriori al 2002 |
Procedure starting date : |
16/03/2015 |
Decision Number: |
DM 305 |
Decision Date: |
24/12/2015 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
|
82/832 |
19/12/2014 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
82/832 |
Application submission date: |
16/12/2014 |
Ministry Protocol Application submission: |
DVA-2014-0041207 |
Ministry Protocol date of application submission: |
27/11/2014 |
Subject: |
Interventi impiantistici presso le unità Topping 3 e Vacuum |
Procedure starting date : |
19/12/2014 |
Decision Number: |
D.M. 190 |
Decision Date: |
12/07/2016 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
|
82/805 |
29/09/2014 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
82/805 |
Application submission date: |
09/09/2014 |
Ministry Protocol Application submission: |
DVA-2014-0029842 |
Ministry Protocol date of application submission: |
19/09/2014 |
Subject: |
Modifica non sostanziale per interventi di miglioramento dell'unità di desolforazione distillati MED1 (HDS1) |
Procedure starting date : |
29/09/2014 |
Decision Number: |
D.M. 190 |
Decision Date: |
12/07/2016 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
|
82/772 |
03/07/2014 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
82/772 |
Application submission date: |
05/06/2014 |
Ministry Protocol Application submission: |
DVA-2014-0019387 |
Ministry Protocol date of application submission: |
17/06/2014 |
Subject: |
Modifica non sostanziale unità FCC/Gas Concentration(unità 030/050) e Merox GPL1 (unità 800). |
Procedure starting date : |
03/07/2014 |
Decision Number: |
D.M. 190 |
Decision Date: |
12/07/2016 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
|
82/620 |
23/09/2013 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
82/620 |
Application submission date: |
03/09/2013 |
Ministry Protocol Application submission: |
DVA-2013-0020864 |
Ministry Protocol date of application submission: |
13/09/2013 |
Subject: |
Modifica non sostanziale per per adeguamento tecnologico del sistema di misurazione di portata scarico a mare |
Procedure starting date : |
23/09/2013 |
Decision Number: |
D.M. 190 |
Decision Date: |
12/07/2016 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
|
82/593 |
23/08/2013 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
82/593 |
Application submission date: |
10/07/2013 |
Ministry Protocol Application submission: |
DVA-2013-0017230 |
Ministry Protocol date of application submission: |
23/07/2013 |
Subject: |
Modifica non sostanziale per per realizzazione intervento impiantistico presso l'unità di cracking catalitico a letto fluido (FCC) |
Procedure starting date : |
23/08/2013 |
Decision Number: |
D.M. 190 |
Decision Date: |
12/07/2016 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
Reconsideration of compliance to permit conditions |
|
82/514 |
21/03/2013 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
82/514 |
Application submission date: |
08/03/2013 |
Ministry Protocol Application submission: |
DVA-2013-0006444 |
Ministry Protocol date of application submission: |
14/03/2013 |
Subject: |
Valutazioni ttemperanza di prescrizione art.1, commi 3-5-7-9 e 12 |
Procedure starting date : |
21/03/2013 |
Decision Number: |
DVA-2015-0000963 |
Decision Date: |
14/01/2015 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
|
82/515 |
21/03/2013 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
82/515 |
Application submission date: |
05/03/2013 |
Ministry Protocol Application submission: |
DVA - 2013 - 0006233 |
Ministry Protocol date of application submission: |
12/03/2013 |
Subject: |
modifica non sostanziale per realizzazione nuova unità recupero vapori (denominata VRU-2) a servizio del Pontile n.2 |
Procedure starting date : |
21/03/2013 |
Decision Number: |
D.M. 190 |
Decision Date: |
12/07/2016 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
|
82/516 |
21/03/2013 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
82/516 |
Application submission date: |
05/03/2013 |
Ministry Protocol Application submission: |
DVA - 2013 - 0006234 |
Ministry Protocol date of application submission: |
12/03/2013 |
Subject: |
Modifica non sostanziale per realizzazione di una nuova unità di recupero e compressione del gas di torcia |
Procedure starting date : |
21/03/2013 |
Decision Number: |
D.M. 190 |
Decision Date: |
12/07/2016 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
Reconsideration of compliance to permit conditions |
|
82/511 |
13/03/2013 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
82/511 |
Application submission date: |
28/02/2013 |
Ministry Protocol Application submission: |
DVA-2013-0005718 |
Ministry Protocol date of application submission: |
06/03/2013 |
Subject: |
Valutazione ottemperanze di prescrizione art.1, commi 8 e 11 del decreto AIA |
Procedure starting date : |
13/03/2013 |
Decision Number: |
DVA-2015-0000963 |
Decision Date: |
14/01/2015 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
|
82/502 |
25/02/2013 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
82/502 |
Application submission date: |
05/02/2013 |
Ministry Protocol Application submission: |
DVA - 2013 - 0003758 |
Ministry Protocol date of application submission: |
13/02/2013 |
Subject: |
Modifica non sostanziale per la realizzazione nuove unità Recupero Zolfo (SRU3),Sour Water Stripper (SWS3) e Rigenerazione Ammine (OGA2) all'interno della Raffineria |
Procedure starting date : |
25/02/2013 |
Decision Number: |
D.M. 190 |
Decision Date: |
12/07/2016 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
Reconsideration of compliance to permit conditions |
|
82/419 |
19/09/2012 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
82/419 |
Application submission date: |
06/09/2012 |
Ministry Protocol Application submission: |
DVA - 2012 - 0021939 |
Ministry Protocol date of application submission: |
13/09/2012 |
Subject: |
Ottemperazna art.1, comma 13 del decreto "Studio volto all'ottimizzazione del ciclo delle acque di stabilimento" |
Procedure starting date : |
19/09/2012 |
Decision Number: |
DVA-2015-0000963 |
Decision Date: |
14/01/2015 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
|
82/373 |
22/06/2012 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
82/373 |
Application submission date: |
24/05/2012 |
Ministry Protocol Application submission: |
DVA - 2012 - 0013431 |
Ministry Protocol date of application submission: |
05/06/2012 |
Subject: |
Modifica non sostanziale:Raffineria di Milazzo S.C.p.A. - modifica non sostanziale all'impianto di trattamento delle acque reflue industriali |
Procedure starting date : |
22/06/2012 |
Decision Number: |
D.M. 190 |
Decision Date: |
12/07/2016 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
Reconsideration of compliance to permit conditions |
|
82/334 |
05/04/2012 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
82/334 |
Application submission date: |
09/03/2012 |
Ministry Protocol Application submission: |
DVA - 2012 - 0006764 |
Ministry Protocol date of application submission: |
19/03/2012 |
Subject: |
Valutazione ottemperanza prescrizione art.1, commi 10, 15 e 16 del decreto AIA |
Procedure starting date : |
05/04/2012 |
Decision Number: |
DVA-2015-0000963 |
Decision Date: |
14/01/2015 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
Reconsideration of compliance to permit conditions |
|
82/309 |
31/01/2012 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
82/309 |
Application submission date: |
29/12/2011 |
Ministry Protocol Application submission: |
DVA - 2012 - 0000533 |
Ministry Protocol date of application submission: |
10/01/2012 |
Subject: |
Valutazione Studio sul pontenziale emissivo del trattamento acque di processo (TAP) della raffineria prescrizione art.1,comma 14 |
Procedure starting date : |
31/01/2012 |
Decision Number: |
DVA-2015-0000963 |
Decision Date: |
14/01/2015 |
Decisions' Outcome: |
Emanato |
Stage of the Procedure: |
Concluded |
IPPC permit for non substantial changes |
|
82/284 |
13/10/2011 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
82/284 |
Application submission date: |
13/07/2011 |
Ministry Protocol Application submission: |
DVA - 2011 - 0018025 |
Ministry Protocol date of application submission: |
21/07/2011 |
Subject: |
realizzazione di un nuovo camino in sostituzione dell'esistente, ubicato presso gli impianti ri recupero zolfo. |
Procedure starting date : |
13/10/2011 |
Decision Number: |
D.M. 190 |
Decision Date: |
12/07/2016 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
IPPC permit for new installation |
|
82/175 |
04/06/2009 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
82/175 |
Application submission date: |
15/07/2008 |
Ministry Protocol Application submission: |
DSA-2008-0020800 |
Ministry Protocol date of application submission: |
25/07/2008 |
Procedure starting date : |
04/06/2009 |
Date of request for integrations: |
25/05/2009 |
Decision Number: |
DVA - DEC - 2011 - 0000255 |
Decision Date: |
16/05/2011 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |
First IPPC permit for existing installation |
|
82 |
31/01/2007 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
82 |
Application submission date: |
25/01/2007 |
Ministry Protocol Application submission: |
DSA-2007-0002933 |
Ministry Protocol date of application submission: |
31/01/2007 |
IPPC Committee's opinion date: |
03/02/2010 |
Services Conference call date: |
11/02/2010 |
Decision Number: |
DVA - DEC - 2011 - 0000042 |
Decision Date: |
14/02/2011 |
Decisions' Outcome: |
Positivo |
Stage of the Procedure: |
Concluded |