Environmental Assessments and Authorizations: SEA - EIA - IPPC Permit

You are in:

Pontremoli-Cortemaggiore DN900 (36") 75 bar gas pipeline


General information

Work: Natural gas pipeline Pontremoli-Cortemaggiore

Project: Pontremoli-Cortemaggiore DN900 (36") 75 bar gas pipeline

Description: The Pontremoli - Cortemaggiore DN 900 gas pipeline for the transportation of natural gas with a density of 0.72 kg/m3 at standard conditions and maximum operating pressure of 75 bar will replace the existing Pontremoli - Cortemaggiore DN 750 gas pipeline. The project involves the construction of a main pipeline of about 108 km, 12 secondary lines with a total length of 20 km and the decommissioning of about 90 km of the DN 750 pipeline .

Developer: SNAM RETE GAS S.p.A.

Project type: Natural gas pipelines

Territories and marine areas

Map

Regions: Emilia Romagna, Toscana

Provinces: Piacenza, Massa-Carrara, Parma

Municipalities: Albareto, Castell'Arquato, Mulazzo, Gropparello, Fiorenzuola d'Arda, Cortemaggiore, Pontremoli, Morfasso, Carpaneto Piacentino, Bore, Vernasca, Bedonia, Borgo Val di Taro, Compiano, Cadeo, Lugagnano Val d'Arda, Bardi

Marine areas: None

Select procedure

Procedure Online application code Procedure Code Starting date Stage of the procedure
EIA Compliance 4590 02/04/2019 EIA-SEA Technical Committee's assessment Procedure details Documents
EIA Compliance 4357 21/11/2018 Concluded Procedure details Documents
EIA Compliance 4202 30/07/2018 Concluded Procedure details Documents
EIA Compliance 3366 19/05/2016 Concluded Procedure details Documents
EIA Compliance 3397 22/03/2016 EIA-SEA Technical Committee's assessment Procedure details Documents
Environmental Impact Assessment 1665 27/05/2009 Concluded Procedure details Documents