Hydroelectric plant of Campolattaro Basin (BN)


General information

Work: Hydroelectric plant of Campolattaro basin (Benevento)

Project: Hydroelectric plant of Campolattaro Basin (BN)

Description: The project involves the construction of a regulation plant with total capacity of 570 MWe. The lower tank, consisting of the artificial reservoir of Campolattaro, will be connected via a system of tunnels and wells in pressure to the storage tank upstream consisting of a natural depression of 7 million m3 capacity. The plant will be connected to the 380 kV powerline line Benevento II - Foggia through the implementation of an overhead power line with a total length of about 23 km and two power stations in Pontelandolfo and Benevento.

Developer: REC S.r.l.

Project type: Hydroelectric facility

Deadline for submission of comments: 11/12/2012 mail

Territories and marine areas

Map

Regions: Campania

Provinces: Benevento

Municipalities: Campolattaro

Marine areas: None

Select procedure

Procedure Online application code Procedure Code Starting date Stage of the procedure
Environmental Impact Assessment 795 31/05/2011 Concluded Procedure details Documents