Realization of the 2nd batch functional - works at sea - District of shipbuilding at the outer harbor east of the harbor - Port of Cagliari


General information

Work: Port of Cagliari

Project: Realization of the 2nd batch functional - works at sea - District of shipbuilding at the outer harbor east of the harbor - Port of Cagliari

Description: The project provides for the advancement of the coast line of about 70 m, the creation of a navigable channel dredged to -3.50 m above sea level inside the outer harbour, a trapezoidal breakwater pier (South pier), a curvilinear inner breakwater (West pier), the east dock, an opening of a gap of about 80 m on the east pier and the dredging of the access channel and of the outer harbour's area for a width of 100 m up to the depth of -5.00 m above sea level.

Developer: Autorità Portuale di Cagliari

Project type: Ports

Other projects related to the same work: Show / Hide

Territories and marine areas

Map

Regions: Sardegna

Provinces: Cagliari

Municipalities: Cagliari

Marine areas: Mar Tirreno Meridionale

Select procedure

Procedure Online application code Procedure Code Starting date Stage of the procedure
EIA Compliance 13307 14/11/2024 EIA-SEA Technical Committee's assessment Procedure details Documents
EIA Compliance 8497 06/06/2022 Concluded Procedure details Documents
EIA Compliance 7367 31/08/2021 Concluded Procedure details Documents
EIA Compliance 7669 15/01/2021 Concluded Procedure details Documents
Environmental Impact Assessment 1785 29/02/2012 Concluded Procedure details Documents