EIA Follow-up (Strategic works Law 443/2001) |
|
9620 |
21/03/2023 |
Administrative control |
Procedure details
|
|
Procedure Code (ID_VIP/ID_MATTM) |
9620 |
Subject
: |
Tratta AV/AC "Terzo Valico dei Giovi". Progetto esecutivo barriere antirumore CUP F81H92000000008 |
Date of application submission: |
21/03/2023 |
Responsible of the procedure: |
Barbara Mulattieri - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Administrative control |
Unsubstantial project changes (Strategic works Law 443/2001) |
|
9421 |
02/02/2023 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
9421 |
Subject
: |
Terzo Valico dei Giovi e Nodo di Genova Progetto di variante - VAR033 - Nuovo PCS di Genova Teglia |
Date of application submission: |
02/02/2023 |
Date of the Opinion of the National Technical Commission : |
27/03/2023 |
National Technical Commission Opinion number: |
423 |
National Technical Commission Opinion outcome: |
Positivo |
Date of the EIA Decree: |
28/04/2023 |
EIA Decree number: |
MASE_VA_DEC_2023-0000216 |
EIA Decree outcome: |
Positivo |
Notification date: |
08/05/2023 |
Notification Reference number: |
MASE_2023-0073390 |
Responsible of the procedure: |
Carlo Di Gianfrancesco - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
Unsubstantial project changes (Strategic works Law 443/2001) |
|
8515 |
22/06/2022 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
8515 |
Subject
: |
Tratta AV/AC Terzo Valico dei Giovi VAR031 -Variante Adeguamento Sottostazione Elettrica di Bivio Corvi |
Date of application submission: |
22/06/2022 |
Date of request for documents perfection : |
11/07/2022 |
Date of perfection proceedings documents receipt: |
12/08/2022 |
Date of the EIA Decree: |
05/12/2022 |
EIA Decree number: |
MiTE_VA_DEC_2022-0000370 |
EIA Decree outcome: |
Positivo |
Notification date: |
07/12/2022 |
Notification Reference number: |
MiTE_2022-0154720 |
Responsible of the procedure: |
Carlo Di Gianfrancesco - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Follow-up (Strategic works Law 443/2001) |
|
6027 |
16/04/2021 |
Administrative control |
Procedure details
|
|
Procedure Code (ID_VIP/ID_MATTM) |
6027 |
Date of application submission: |
16/04/2021 |
Stage of the Procedure: |
Administrative control |
Unsubstantial project changes (Strategic works Law 443/2001) |
|
5623 |
22/10/2020 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
5623 |
Subject
: |
Programma delle infrastrutture strategiche (legge 443/2001). Tratta Av/AC Terzo Valico dei Giovi. Variante PRG di Rivalta Scrivia e attrezzaggio della tratta Rivalta-Tortona. Comunicazione ai sensi dell'art.169, comma4, del D.Lgs 163/2006 e s.m.i per gli effetti dell'art.1, comma 15, della L.55/2019 di conversione dei D.L: 32/2019 del progetto di variante |
Date of application submission: |
22/10/2020 |
Date of notification to the developer of the procedure outcomes: |
05/03/2021 |
Date of the Opinion of the National Technical Commission : |
29/01/2021 |
National Technical Commission Opinion number: |
50 |
National Technical Commission Opinion outcome: |
Positivo |
Notification Reference number: |
MATTM-2021-0023240 |
Outcome: |
Positivo |
Responsible of the procedure: |
Carlo Di Gianfrancesco - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Follow-up (Strategic works Law 443/2001) |
|
4455 |
15/01/2019 |
Pending the start of the enivronmental monitoring
|
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
4455 |
Subject
: |
Linea Ferroviaria AV/AC Milano-Genova - Lotto 5 |
Date of application submission: |
15/01/2019 |
Date of notification to the developer of the procedure outcomes: |
18/08/2020 |
Date of the Opinion of the National Technical Commission - Stage 1: Adequacy of the executive project to the final project and compliance to the prescriptions: |
23/04/2020 |
National Technical Commission Opinion number - Stage 1: |
3325 |
National Technical Commission Opinion outcome - Stage 1: |
Positivo con prescrizioni |
Determination date - Stage 1: Adequacy of the executive project to the final project and prescriptions compliance : |
31/07/2020 |
Determination number - Stage 1 : |
DEC-240 |
Determination outcome - Stage 1: |
Positivo con prescrizioni |
Notification Reference number: |
64836 |
Outcome: |
Positivo con prescrizioni |
Responsible of the procedure: |
Barbara Mulattieri - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Pending the start of the enivronmental monitoring
|
Unsubstantial project changes (Strategic works Law 443/2001) |
|
4223 |
06/08/2018 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
4223 |
Subject
: |
Modifica del progetto di cantierizzazione del cantiere COP 20 - Radimero |
Date of application submission: |
06/08/2018 |
Technical assessment starting date: |
29/08/2018 |
Date of notification to the developer of the procedure outcomes: |
06/02/2019 |
Date of the Opinion of the National Technical Commission : |
18/01/2018 |
National Technical Commission Opinion number: |
PRR-2924 |
National Technical Commission Opinion outcome: |
Prescrizioni |
Notification Reference number: |
DVA/2019/2966 |
Outcome: |
Prescrizioni |
Responsible of the procedure: |
Carlo Di Gianfrancesco - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
Unsubstantial project changes (Strategic works Law 443/2001) |
|
3973 |
12/03/2018 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3973 |
Subject
: |
Bivio Fegino - Variante Rilocalizzazione Fabbricato Tecnologico FA91 |
Date of application submission: |
12/03/2018 |
Technical assessment starting date: |
14/03/2018 |
Date of notification to the developer of the procedure outcomes: |
14/02/2019 |
Date of the Opinion of the National Technical Commission : |
18/01/2019 |
National Technical Commission Opinion number: |
PRR-2929-18012019 |
National Technical Commission Opinion outcome: |
Positivo con prescrizioni |
Notification Reference number: |
DVA-DEC-0000032 |
Outcome: |
Positivo con prescrizioni |
Responsible of the procedure: |
Carlo Di Gianfrancesco - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Follow-up (Strategic works Law 443/2001) |
|
3635 |
12/06/2017 |
Pending the start of the enivronmental monitoring
|
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3635 |
Subject
: |
Linea Ferroviaria AV/AC Milano-Genova - Lotto 4 |
Date of application submission: |
13/06/2017 |
Date of request for documents perfection : |
09/06/2023 |
Date of integrations receipt: |
27/11/2017 |
Date of notification to the developer of the procedure outcomes: |
06/12/2019 |
Date of integrations second receipt: |
16/02/2018 |
Determination date - Stage 1: Adequacy of the executive project to the final project and prescriptions compliance : |
21/11/2019 |
Determination number - Stage 1 : |
DEC 367 |
Determination outcome - Stage 1: |
Positivo |
Notification Reference number: |
DVA/2019/31816 |
Responsible of the procedure: |
Barbara Mulattieri - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Pending the start of the enivronmental monitoring
|
Unsubstantial project changes (Strategic works Law 443/2001) |
|
3330 |
18/04/2016 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3330 |
Subject
: |
Variante progettuale a seguito delle nuove norme relative alla "Sicurezza nelle Gallerie Ferroviarie (DM 28.10.2005)" |
Date of application submission: |
18/04/2016 |
Technical assessment starting date: |
19/04/2016 |
Date of notification to the developer of the procedure outcomes: |
24/06/2016 |
Date of the Opinion of the National Technical Commission : |
17/06/2016 |
National Technical Commission Opinion number: |
2105 |
National Technical Commission Opinion outcome: |
Positivo con prescrizioni |
Notification Reference number: |
DVA-DEC-2016-0000247 |
Outcome: |
Positivo con prescrizioni |
Responsible of the procedure: |
Carlo Di Gianfrancesco - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
Environmental Impact Assessment (Strategic works Law 443/2001) |
|
3274 |
01/02/2016 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3274 |
Subject
: |
Progetto definitivo della variante "Interconnessione di Novi Ligure alternativa allo Shunt" |
Date of application submission: |
01/02/2016 |
Publication date of the notice in newspapers: |
08/02/2016 |
Deadline of submission of Public Comments: |
09/03/2016 |
Technical assessment starting date: |
11/02/2016 |
Date of request for integrations: |
10/06/2016 |
Date of integrations receipt: |
15/09/2016 |
Date of the Opinion of the National Technical Commission : |
03/03/2017 |
National Technical Commission Opinion number: |
2324 |
National Technical Commission Opinion outcome: |
Positivo con prescrizioni |
Date of the communication of the Opinion to the Ministry of Infrastructures and Transports : |
15/05/2017 |
Notes: |
Il Proponente ha dichiarato che le pubblicazioni sui quotidiani avverranno il giorno 08/02/2016 e, pertanto, i termini per la presentazione delle osservazioni decorreranno da tale data. |
Responsible of the procedure: |
Carlo Di Gianfrancesco - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Follow-up (Strategic works Law 443/2001) |
|
3103 |
24/08/2015 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3103 |
Subject
: |
Aggiornamento progetto esecutivo Cantieri, Campi base e Opere |
Date of application submission: |
24/08/2015 |
Date of the Opinion of the National Technical Commission - Stage 1: Adequacy of the executive project to the final project and compliance to the prescriptions: |
18/12/2015 |
National Technical Commission Opinion number - Stage 1: |
1951 |
National Technical Commission Opinion outcome - Stage 1: |
Positivo |
Determination date - Stage 1: Adequacy of the executive project to the final project and prescriptions compliance : |
21/01/2016 |
Determination number - Stage 1 : |
DVA-DEC-2016-0000013 |
Determination outcome - Stage 1: |
Positivo |
Responsible of the procedure: |
Carlo Di Gianfrancesco - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
Unsubstantial project changes (Strategic works Law 443/2001) |
|
3097 |
07/08/2015 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3097 |
Subject
: |
By-pass di collegamento tra Galleria Campasso e Interconnessione di Voltri |
Date of application submission: |
07/08/2015 |
Technical assessment starting date: |
19/08/2015 |
Date of notification to the developer of the procedure outcomes: |
09/11/2015 |
Date of the Opinion of the National Technical Commission : |
23/10/2015 |
National Technical Commission Opinion number: |
1903 |
National Technical Commission Opinion outcome: |
Positivo |
Notification Reference number: |
DVA-DEC-2015-0000401 |
Outcome: |
Positivo |
Responsible of the procedure: |
Carlo Di Gianfrancesco - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Follow-up (Strategic works Law 443/2001) |
|
2981 |
26/03/2015 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
2981 |
Subject
: |
Linea Ferroviaria AV/AC Milano-Genova - Lotto 3 - Fase 1 |
Date of application submission: |
27/03/2015 |
Date of integrations receipt: |
08/09/2016 |
Date of integrations second receipt: |
23/09/2016 |
Date of the Opinion of the National Technical Commission - Stage 1: Adequacy of the executive project to the final project and compliance to the prescriptions: |
02/12/2016 |
National Technical Commission Opinion number - Stage 1: |
2254 |
National Technical Commission Opinion outcome - Stage 1: |
Positivo |
Determination date - Stage 1: Adequacy of the executive project to the final project and prescriptions compliance : |
29/12/2016 |
Determination number - Stage 1 : |
DVA-DEC-2016-0000475 |
Determination outcome - Stage 1: |
Positivo |
Responsible of the procedure: |
Carlo Di Gianfrancesco - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Follow-up (Strategic works Law 443/2001) |
|
2957 |
11/02/2015 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
2957 |
Subject
: |
2° Stralcio cantierizzazione dal Lotto 3 in poi |
Date of application submission: |
11/02/2015 |
Date of the Opinion of the National Technical Commission - Stage 1: Adequacy of the executive project to the final project and compliance to the prescriptions: |
18/12/2015 |
National Technical Commission Opinion number - Stage 1: |
1952 |
Determination date - Stage 1: Adequacy of the executive project to the final project and prescriptions compliance : |
30/12/2015 |
Determination number - Stage 1 : |
DVADEC-2015-0000490 |
Determination outcome - Stage 1: |
Positivo |
Responsible of the procedure: |
Carlo Di Gianfrancesco - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Follow-up (Strategic works Law 443/2001) |
|
2864 |
10/10/2014 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
2864 |
Subject
: |
Linea Ferroviaria AV/AC Milano-Genova - Lotto 6 |
Date of application submission: |
10/10/2014 |
Responsible of the procedure: |
Carlo Di Gianfrancesco - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Follow-up (Strategic works Law 443/2001) |
|
2831 |
13/08/2014 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
2831 |
Subject
: |
Linea Ferroviaria AV/AC Milano-Genova - Lotto 1 - Fase 2 |
Date of application submission: |
13/08/2014 |
Date of integrations receipt: |
09/02/2015 |
Responsible of the procedure: |
Carlo Di Gianfrancesco - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
Unsubstantial project changes (Strategic works Law 443/2001) |
|
2810 |
01/08/2014 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
2810 |
Subject
: |
Variazione organizzativa del cantiere operativo denominato COL2 |
Date of application submission: |
01/08/2014 |
Technical assessment starting date: |
28/08/2014 |
Date of notification to the developer of the procedure outcomes: |
29/10/2014 |
Date of the Opinion of the National Technical Commission : |
03/10/2014 |
National Technical Commission Opinion number: |
1621 |
National Technical Commission Opinion outcome: |
Positivo |
Notification Reference number: |
DVA-2014-0035077 |
Outcome: |
Positivo |
Responsible of the procedure: |
Carlo Di Gianfrancesco - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Follow-up (Strategic works Law 443/2001) |
|
2668 |
21/02/2014 |
EIA-SEA Technical Committee's assessment
|
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
2668 |
Subject
: |
Linea Ferroviaria AV/AC Milano-Genova - Lotto 2 |
Date of application submission: |
21/02/2014 |
Date of request for documents perfection : |
11/05/2022 |
Date of integrations receipt: |
20/05/2022 |
Date of notification to the developer of the procedure outcomes: |
07/07/2020 |
Date of the Opinion of the National Technical Commission - Stage 1: Adequacy of the executive project to the final project and compliance to the prescriptions: |
19/09/2014 |
National Technical Commission Opinion number - Stage 1: |
1616 |
National Technical Commission Opinion outcome - Stage 1: |
Parere espresso |
Determination date - Stage 1: Adequacy of the executive project to the final project and prescriptions compliance : |
30/10/2014 |
Determination number - Stage 1 : |
DVA-2014-0035438 |
Determination outcome - Stage 1: |
Positivo |
Date of the Opinion of the National Technical Commission - Stage 2: environmental monitoring and prescriptions compliance : |
13/02/2020 |
National Technical Commission Opinion number - Stage 2: |
3282 |
National Technical Commission Opinion outcome - Stage 2: |
Positivo |
Determination date - Stage 2: environmental monitoring and prescriptions compliance : |
24/06/2020 |
Determination number - Stage 2 : |
180 |
Determination outcome - Stage 2: |
Positivo |
Notification Reference number: |
52102 |
Outcome: |
Positivo |
Responsible of the procedure: |
Barbara Mulattieri - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
EIA-SEA Technical Committee's assessment
|
EIA Follow-up (Strategic works Law 443/2001) |
|
2194 |
29/01/2013 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
2194 |
Subject
: |
Linea Ferroviaria AV/AC Milano-Genova - Lotto 1 |
Date of application submission: |
29/01/2013 |
Date of the Opinion of the National Technical Commission on usage Plan: |
04/10/2013 |
Opinion number of the National Technical Commission on usage Plan: |
1349 |
Opinion outcome of the National Technical Commission on usage Plan: |
Positivo con prescrizioni |
Usage Plan Determination date: |
24/10/2013 |
Determination number on usage Plan: |
24380 |
Usage Plan Determination outcome: |
Positivo con prescrizioni |
Date of the Opinion of the National Technical Commission - Stage 1: Adequacy of the executive project to the final project and compliance to the prescriptions: |
23/05/2014 |
National Technical Commission Opinion number - Stage 1: |
1501 |
National Technical Commission Opinion outcome - Stage 1: |
Parere espresso |
Determination date - Stage 1: Adequacy of the executive project to the final project and prescriptions compliance : |
27/06/2014 |
Determination number - Stage 1 : |
DVA-2014-0021283 |
Determination outcome - Stage 1: |
Positivo con prescrizioni |
Stage of the Procedure: |
Concluded |
Environmental Observatory |
|
|
14/09/2012 |
- |
Procedure details
|
|
Observatory setting up date: |
14/09/2012 |
Stage of the Procedure: |
- |
EIA Compliance (Strategic works Law 443/2001) |
|
764 |
19/09/2005 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
764 |
Subject
: |
Intero Progetto |
Date of application submission: |
19/09/2005 |
Date of perfection proceedings documents receipt: |
17/10/2005 |
Technical assessment starting date: |
21/10/2005 |
Date of notification to the developer of the procedure outcomes: |
19/12/2005 |
Date of Special EIA Commission Opinion: |
16/12/2005 |
Special EIA Commission Opinion outcome: |
Ottemperato con condizioni |
Notification Reference number: |
DSA-2005-32790 |
Outcome: |
Ottemperata |
Stage of the Procedure: |
Concluded |
Environmental Impact Assessment (Strategic works Law 443/2001) |
|
601 |
10/03/2003 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
601 |
Date of application submission: |
10/03/2003 |
Publication date of the notice in newspapers: |
10/03/2003 |
Deadline of submission of Public Comments: |
09/04/2003 |
Technical assessment starting date: |
15/05/2003 |
Date of request for integrations: |
16/06/2003 |
Date of integrations receipt: |
15/07/2003 |
Date of Special EIA Commission Opinion: |
28/08/2003 |
Special EIA Commission Opinion outcome: |
Positivo con prescrizioni |
Date of CIPE Deliberation: |
29/09/2003 |
CIPE Deliberation number : |
78 |
CIPE Deliberation outcome: |
Positivo con prescrizioni |
Publication date of CIPE Deliberation in the Italian Republic Official Journal : |
21/01/2004 |
Italian Republic Official Journal number : |
9 |
Stage of the Procedure: |
Concluded |