EIA Compliance |
|
9725 |
12/04/2023 |
EIA-SEA Technical Committee's assessment
|
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
9725 |
Subject
: |
Gasdotto denominato "Trans Adriatic Pipeline" per il trasporto in Italia di gas dalla Regione del Mar Caspio attraverso Grecia ed Albania - Società TAP AG Italia - Prescrizione: A.56 |
Date of application submission: |
12/04/2023 |
Responsible of the procedure: |
Orsola Renata Reillo - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
EIA-SEA Technical Committee's assessment
|
EIA Compliance |
|
4084 |
22/06/2021 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
4084 |
Subject
: |
Microtunnel di approdo al tratto italiano del gasdotto Trans Adriatic Pipeline, verifica di assoggettabilità presentata in ottemperanza alla prescrizione A5) del DM 223 dell'11.09.2014 - Prescrizione: 1 |
Date of application submission: |
22/06/2021 |
Communication date of the outcome to the developer: |
02/02/2023 |
Protocol of outcome communication to the developer: |
MiTE-2023-0014884 |
Outcome: |
Ottemperata |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
5076 |
22/06/2021 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
5076 |
Subject
: |
Microtunnel di approdo al tratto italiano del gasdotto Trans Adriatic Pipeline, verifica di assoggettabilità presentata in ottemperanza alla prescrizione A5) del DM 223 dell'11.09.2014 - Prescrizione: 4 |
Date of application submission: |
22/06/2021 |
Communication date of the outcome to the developer: |
02/02/2023 |
Protocol of outcome communication to the developer: |
MiTE-2023-0014903 |
Outcome: |
Ottemperata |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
4731 |
22/06/2021 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
4731 |
Subject
: |
Gasdotto denominato "Trans Adriatic Pipeline" per il trasporto in Italia di gas dalla Regione del Mar Caspio attraverso Grecia ed Albania - Società TAP AG Italia - Prescrizione: A.55 |
Date of application submission: |
22/06/2021 |
Date of the Opinion of the National Technical Commission : |
28/03/2022 |
National Technical Commission Opinion number: |
457 |
National Technical Commission Opinion outcome: |
Ottemperata |
Determination date: |
08/06/2022 |
Determination number: |
MiTE_VA_DEC_2022-0000092 |
Determination outcome: |
Ottemperata |
Notification date: |
10/06/2022 |
Notification Reference number: |
MiTE-2022-0072832 |
Responsible of the procedure: |
Carmela Bilanzone - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
6238 |
22/06/2021 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
6238 |
Subject
: |
Gasdotto denominato "Trans Adriatic Pipeline" per il trasporto in Italia di gas dalla Regione del Mar Caspio attraverso Grecia ed Albania - Società TAP AG Italia - Prescrizione: A.53 |
Date of application submission: |
22/06/2021 |
Date of the Opinion of the National Technical Commission : |
28/03/2022 |
National Technical Commission Opinion number: |
456 |
National Technical Commission Opinion outcome: |
Ottemperanza |
Determination date: |
08/06/2022 |
Determination number: |
MiTE_VA_DEC_2022-0000091 |
Determination outcome: |
Ottemperanza |
Notification date: |
10/06/2022 |
Notification Reference number: |
MiTE-2022-0072833 |
Responsible of the procedure: |
Carmela Bilanzone - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
6239 |
22/06/2021 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
6239 |
Date of application submission: |
22/06/2021 |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
5083 |
22/06/2021 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
5083 |
Date of application submission: |
22/06/2021 |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
5903 |
22/06/2021 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
5903 |
Date of application submission: |
22/06/2021 |
Date of the Opinion of the National Technical Commission : |
28/03/2022 |
National Technical Commission Opinion number: |
455 |
National Technical Commission Opinion outcome: |
Ottemperata |
Determination date: |
20/06/2022 |
Determination number: |
MiTE_VA_DEC_2022-0000105 |
Determination outcome: |
Ottemperata |
Notification date: |
30/06/2022 |
Notification Reference number: |
MiTE-2022-0081614 |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
6242 |
22/06/2021 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
6242 |
Subject
: |
Gasdotto denominato "Trans Adriatic Pipeline" per il trasporto in Italia di gas dalla Regione del Mar Caspio attraverso Grecia ed Albania - Società TAP AG Italia - Prescrizione: A.49 |
Date of application submission: |
22/06/2021 |
Date of the Opinion of the National Technical Commission : |
28/03/2022 |
National Technical Commission Opinion number: |
455 |
National Technical Commission Opinion outcome: |
Ottemperata |
Determination date: |
20/06/2022 |
Determination number: |
MiTE_VA_DEC_2022-0000105 |
Determination outcome: |
Ottemperata |
Notification date: |
30/06/2022 |
Notification Reference number: |
MiTE-2022-0081614 |
Responsible of the procedure: |
Carmela Bilanzone - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
6241 |
22/06/2021 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
6241 |
Subject
: |
Gasdotto denominato "Trans Adriatic Pipeline" per il trasporto in Italia di gas dalla Regione del Mar Caspio attraverso Grecia ed Albania - Società TAP AG Italia - Prescrizione: A.48 |
Date of application submission: |
22/06/2021 |
Date of the Opinion of the National Technical Commission : |
28/03/2022 |
National Technical Commission Opinion number: |
455 |
National Technical Commission Opinion outcome: |
Ottemperata |
Determination date: |
28/03/2022 |
Determination number: |
MiTE_VA_DEC_2022-0000105 |
Determination outcome: |
Ottemperata |
Notification date: |
30/06/2022 |
Notification Reference number: |
MiTE-2022-0081614 |
Responsible of the procedure: |
Carmela Bilanzone - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
6243 |
22/06/2021 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
6243 |
Subject
: |
Gasdotto denominato "Trans Adriatic Pipeline" per il trasporto in Italia di gas dalla Regione del Mar Caspio attraverso Grecia ed Albania - Società TAP AG Italia - Prescrizione: A.47 |
Date of application submission: |
22/06/2021 |
Date of the Opinion of the National Technical Commission : |
28/03/2022 |
National Technical Commission Opinion number: |
454 |
National Technical Commission Opinion outcome: |
Ottemperata |
Determination date: |
20/06/2022 |
Determination number: |
MiTE_VA_DEC_2022-0000106 |
Determination outcome: |
Ottemperata |
Notification date: |
30/06/2022 |
Notification Reference number: |
MiTE_2022-0081584 |
Responsible of the procedure: |
Carmela Bilanzone - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
6237 |
22/06/2021 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
6237 |
Date of application submission: |
22/06/2021 |
Date of the Opinion of the National Technical Commission : |
28/03/2022 |
National Technical Commission Opinion number: |
453 |
National Technical Commission Opinion outcome: |
Ottemperata |
Determination date: |
20/06/2022 |
Determination number: |
MiTE_VA_DEC_2022-0000107 |
Determination outcome: |
Ottemperata |
Notification date: |
30/06/2022 |
Notification Reference number: |
MiTE-2022-0081611 |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
4531 |
22/06/2021 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
4531 |
Subject
: |
Gasdotto denominato "Trans Adriatic Pipeline" per il trasporto in Italia di gas dalla Regione del Mar Caspio attraverso Grecia ed Albania - Società TAP AG Italia - Prescrizione: A.42 |
Date of application submission: |
22/06/2021 |
Responsible of the procedure: |
Carmela Bilanzone - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
7301 |
22/06/2021 |
EIA-SEA Technical Committee's assessment
|
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
7301 |
Date of application submission: |
22/06/2021 |
Stage of the Procedure: |
EIA-SEA Technical Committee's assessment
|
EIA Compliance |
|
5089 |
22/01/2020 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
5089 |
Subject
: |
Gasdotto denominato "Trans Adriatic Pipeline" per il trasporto in Italia di gas dalla Regione del Mar Caspio attraverso Grecia ed Albania - Società TAP AG Italia - Prescrizione: A.2 |
Date of application submission: |
22/01/2020 |
Determination date: |
18/02/2020 |
Determination number: |
MATTM11484 |
Determination outcome: |
Ottemperata |
Responsible of the procedure: |
Dario Fornari - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
4635 |
29/04/2019 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
4635 |
Subject
: |
Microtunnel di approdo al tratto italiano del gasdotto Trans Adriatic Pipeline, verifica di assoggettabilità presentata in ottemperanza alla prescrizione A5) del DM 223 dell'11.09.2014 - Prescrizione: 3 |
Date of application submission: |
29/04/2019 |
Date of notification to the developer of the procedure outcomes: |
02/12/2019 |
Determination date: |
02/12/2019 |
Determination number: |
DVA/2019/31390 |
Determination outcome: |
ottemperata |
Notification Reference number: |
DVA/2019/31390 |
Responsible of the procedure: |
Dario Fornari - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
4581 |
28/03/2019 |
EIA-SEA Technical Committee's assessment
|
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
4581 |
Subject
: |
Microtunnel di approdo al tratto italiano del gasdotto Trans Adriatic Pipeline, verifica di assoggettabilità presentata in ottemperanza alla prescrizione A5) del DM 223 dell'11.09.2014 - Prescrizione: 2 |
Date of application submission: |
28/03/2019 |
Technical assessment starting date: |
04/09/2019 |
Determination date: |
07/07/2020 |
Determination number: |
52364 |
Determination outcome: |
Ottemperata |
Responsible of the procedure: |
Carmela Bilanzone - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
EIA-SEA Technical Committee's assessment
|
EIA Compliance |
|
4433 |
15/12/2018 |
Decision being prepared
|
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
4433 |
Subject
: |
Prescrizione A.36 del Decreto VIA n. 366 del 23/11/2017 - Costruzione del PRT |
Date of application submission: |
15/12/2018 |
Responsible of the procedure: |
Carmela Bilanzone - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Decision being prepared
|
EIA Compliance |
|
4436 |
28/11/2018 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
4436 |
Subject
: |
Prescrizione A.56 del Decreto VIA n. 366 del 23/11/2017 |
Date of application submission: |
28/11/2018 |
Communication date of the outcome to the developer: |
24/03/2023 |
Protocol of outcome communication to the developer: |
MASE_2023-0045358 |
Outcome: |
Non Ottemperata |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
3852 |
13/12/2017 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3852 |
Subject
: |
Prescrizione A.26 del Decreto VIA n. 223 del 11/09/2014 |
Date of application submission: |
13/12/2017 |
Technical assessment starting date: |
18/12/2017 |
Determination date: |
24/04/2018 |
Determination number: |
DVA-2018-0009637 |
Determination outcome: |
Ottemperata |
Responsible of the procedure: |
Carmela Bilanzone - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
3851 |
13/12/2017 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3851 |
Subject
: |
Prescrizione A.15 del Decreto VIA n. 223 del 11/09/2014 |
Date of application submission: |
13/12/2017 |
Technical assessment starting date: |
18/12/2017 |
Date of notification to the developer of the procedure outcomes: |
30/07/2019 |
Date of the Opinion of the National Technical Commission : |
04/07/2019 |
National Technical Commission Opinion number: |
3032 |
National Technical Commission Opinion outcome: |
Ottemperata |
Determination date: |
19/07/2019 |
Determination number: |
DVA_DEC_2019-0000261 |
Determination outcome: |
Ottemperata |
Notification Reference number: |
DVA-2019-0019751 |
Outcome: |
Ottemperata |
Responsible of the procedure: |
Carmela Bilanzone - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
3850 |
13/12/2017 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3850 |
Subject
: |
Prescrizione A.14 del Decreto VIA n. 223 del 11/09/2014 |
Date of application submission: |
13/12/2017 |
Technical assessment starting date: |
18/12/2017 |
Date of notification to the developer of the procedure outcomes: |
27/06/2019 |
Date of the Opinion of the National Technical Commission : |
07/06/2019 |
National Technical Commission Opinion number: |
3031 |
National Technical Commission Opinion outcome: |
Ottemperata |
Determination date: |
21/06/2019 |
Determination number: |
DVA_DEC_2019-0000218 |
Determination outcome: |
Ottemperata |
Notification Reference number: |
DVA_2019-0016571 |
Outcome: |
Ottemperata |
Responsible of the procedure: |
Carmela Bilanzone - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
3849 |
13/12/2017 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3849 |
Subject
: |
Prescrizione A.10 del Decreto VIA n. 223 del 11/09/2014 |
Date of application submission: |
13/12/2017 |
Technical assessment starting date: |
18/12/2017 |
Date of notification to the developer of the procedure outcomes: |
20/05/2019 |
Notification Reference number: |
DVA-2019-0012723 |
Outcome: |
Archiviazione Istanza |
Responsible of the procedure: |
Carmela Bilanzone - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
3848 |
13/12/2017 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3848 |
Subject
: |
Prescrizione A.8 del Decreto VIA n. 223 del 11/09/2014 |
Date of application submission: |
13/12/2017 |
Technical assessment starting date: |
18/12/2017 |
Date of notification to the developer of the procedure outcomes: |
17/12/2018 |
Date of the Opinion of the National Technical Commission : |
21/09/2018 |
National Technical Commission Opinion number: |
2827 |
National Technical Commission Opinion outcome: |
Ottemperata |
Determination date: |
26/11/2018 |
Determination number: |
DVA-DEC-2018-0000437 |
Determination outcome: |
Ottemperata |
Notification Reference number: |
DVA-2018-0028535 |
Responsible of the procedure: |
Carmela Bilanzone - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
3847 |
13/12/2017 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3847 |
Subject
: |
Prescrizione A.7 del Decreto VIA n. 223 del 11/09/2014 |
Date of application submission: |
13/12/2017 |
Technical assessment starting date: |
18/12/2017 |
Date of notification to the developer of the procedure outcomes: |
10/12/2018 |
Date of the Opinion of the National Technical Commission : |
09/11/2018 |
National Technical Commission Opinion number: |
2862 |
National Technical Commission Opinion outcome: |
Ottemperata |
Determination date: |
26/11/2018 |
Determination number: |
DVA-DEC-2018-0000435 |
Determination outcome: |
Ottemperata |
Notification Reference number: |
DVA-2018-0027900 |
Responsible of the procedure: |
Carmela Bilanzone - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
3846 |
13/12/2017 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3846 |
Subject
: |
Prescrizione A.1 del Decreto VIA n. 223 del 11/09/2014 |
Date of application submission: |
13/12/2017 |
Technical assessment starting date: |
18/12/2017 |
Date of notification to the developer of the procedure outcomes: |
09/04/2019 |
Date of the Opinion of the National Technical Commission : |
15/03/2019 |
National Technical Commission Opinion number: |
PRR-2019-2970 |
National Technical Commission Opinion outcome: |
Ottemperata |
Determination date: |
28/03/2019 |
Determination number: |
DVA/DEC/107 |
Determination outcome: |
Ottemperata |
Notification Reference number: |
DVA/2019/9170 |
Outcome: |
Ottemperata |
Responsible of the procedure: |
Carmela Bilanzone - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
3799 |
29/11/2017 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3799 |
Subject
: |
Prescrizione A.29 parte 2 del Decreto VIA n. 366 del 23/11/2017 |
Date of application submission: |
29/11/2017 |
Technical assessment starting date: |
12/12/2017 |
Date of the Opinion of the National Technical Commission : |
26/01/2018 |
National Technical Commission Opinion number: |
2613 |
National Technical Commission Opinion outcome: |
Ottemperata |
Determination date: |
08/02/2018 |
Determination number: |
DVA-DEC-2018-0000062 |
Determination outcome: |
Ottemperata |
Responsible of the procedure: |
Carmela Bilanzone - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
3753 |
09/10/2017 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3753 |
Subject
: |
Prescrizione A.40 del Decreto VIA n. 223 del 11/09/2014 |
Date of application submission: |
09/10/2017 |
Technical assessment starting date: |
16/10/2017 |
Date of integrations receipt: |
05/03/2018 |
Date of the Opinion of the National Technical Commission : |
18/05/2018 |
National Technical Commission Opinion number: |
2730 |
National Technical Commission Opinion outcome: |
Ottemperata |
Determination date: |
30/05/2018 |
Determination number: |
DVA-DEC-2018-0000255 |
Determination outcome: |
Ottemperata |
Responsible of the procedure: |
Carmela Bilanzone - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
3752 |
09/10/2017 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3752 |
Subject
: |
Prescrizione A.28 (Seconda Parte) del Decreto VIA n. 223 del 11/09/2014 |
Date of application submission: |
09/10/2017 |
Technical assessment starting date: |
16/10/2017 |
Date of the Opinion of the National Technical Commission : |
20/04/2018 |
National Technical Commission Opinion number: |
2712 |
National Technical Commission Opinion outcome: |
Ottemperata |
Determination date: |
29/05/2018 |
Determination number: |
DVA-DEC-2018-0000254 |
Determination outcome: |
Ottemperata |
Responsible of the procedure: |
Carmela Bilanzone - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
3751 |
09/10/2017 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3751 |
Subject
: |
Prescrizione A.18 (Seconda Parte) del Decreto VIA n. 223 del 11/09/2014 |
Date of application submission: |
09/10/2017 |
Technical assessment starting date: |
16/10/2017 |
Date of the Opinion of the National Technical Commission : |
15/06/2018 |
National Technical Commission Opinion number: |
2760 |
National Technical Commission Opinion outcome: |
Ottemperata |
Determination date: |
18/07/2018 |
Determination number: |
DVA-DEC-2018-0000318 |
Determination outcome: |
Ottemperata |
Responsible of the procedure: |
Carmela Bilanzone - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
3741 |
03/10/2017 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3741 |
Subject
: |
Prescrizione A.44 (Seconda Parte) del Decreto VIA n. 223 del 11/09/2014 |
Date of application submission: |
03/10/2017 |
Technical assessment starting date: |
09/10/2017 |
Date of the Opinion of the National Technical Commission : |
12/01/2018 |
National Technical Commission Opinion number: |
2601 |
National Technical Commission Opinion outcome: |
Ottemperata |
Determination date: |
18/01/2018 |
Determination number: |
DVA-DEC-2018-0000027 |
Determination outcome: |
Ottemperata |
Responsible of the procedure: |
Carmela Bilanzone - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
3732 |
02/10/2017 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3732 |
Subject
: |
Prescrizione A.45 parte II del Decreto VIA n. 223 del 11/09/2014 |
Date of application submission: |
02/10/2017 |
Determination date: |
11/12/2017 |
Determination number: |
DVA-DEC-2017-0000414 |
Determination outcome: |
Ottemperata |
Responsible of the procedure: |
Carmela Bilanzone - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
3731 |
02/10/2017 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3731 |
Subject
: |
Prescrizione A.24 del Decreto VIA n. 223 del 11/09/2014 |
Date of application submission: |
02/10/2017 |
Determination date: |
10/11/2017 |
Determination number: |
DVA-DEC-2017-0000323 |
Determination outcome: |
Ottemperata |
Responsible of the procedure: |
Carmela Bilanzone - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
3727 |
22/09/2017 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3727 |
Subject
: |
Prescrizione A.41 del Decreto VIA n. 223 del 11/09/2014 |
Date of application submission: |
22/09/2017 |
Technical assessment starting date: |
02/10/2017 |
Date of the Opinion of the National Technical Commission : |
27/10/2017 |
National Technical Commission Opinion number: |
2541 |
National Technical Commission Opinion outcome: |
Ottemperata |
Determination date: |
15/11/2017 |
Determination number: |
DVA-DEC-2017-0000346 |
Determination outcome: |
Ottemperata |
Responsible of the procedure: |
Carmela Bilanzone - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
3726 |
22/09/2017 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3726 |
Subject
: |
Prescrizione A.32 del Decreto VIA n. 223 del 11/09/2014 |
Date of application submission: |
22/09/2017 |
Technical assessment starting date: |
02/10/2017 |
Date of the Opinion of the National Technical Commission : |
27/10/2017 |
National Technical Commission Opinion number: |
2542 |
National Technical Commission Opinion outcome: |
Ottemperata |
Determination date: |
10/11/2017 |
Determination number: |
DVA-DEC-2017-0000325 |
Determination outcome: |
Ottemperata |
Responsible of the procedure: |
Carmela Bilanzone - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
3725 |
22/09/2017 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3725 |
Subject
: |
Prescrizione A.31 del Decreto VIA n. 223 del 11/09/2014 |
Date of application submission: |
22/09/2017 |
Technical assessment starting date: |
02/10/2017 |
Date of notification to the developer of the procedure outcomes: |
16/02/2021 |
Date of the Opinion of the National Technical Commission : |
10/11/2017 |
National Technical Commission Opinion number: |
2545 |
National Technical Commission Opinion outcome: |
Ottemperata |
Determination date: |
20/11/2017 |
Determination number: |
DVA-DEC-2017-0000358 |
Determination outcome: |
Ottemperata |
Notification Reference number: |
MATTM-2021-0015906 |
Outcome: |
Ottemperata |
Responsible of the procedure: |
Carmela Bilanzone - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
3724 |
22/09/2017 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3724 |
Subject
: |
Prescrizione A.23 del Decreto VIA n. 223 del 11/09/2014 |
Date of application submission: |
22/09/2017 |
Technical assessment starting date: |
02/10/2017 |
Date of the Opinion of the National Technical Commission : |
10/11/2017 |
National Technical Commission Opinion number: |
2544 |
National Technical Commission Opinion outcome: |
Ottemperata |
Determination date: |
21/11/2017 |
Determination number: |
DVA-DEC-2017-0000362 |
Determination outcome: |
Ottemperata |
Responsible of the procedure: |
Carmela Bilanzone - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
3723 |
22/09/2017 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3723 |
Subject
: |
Prescrizione A.18 (Prima Parte) del Decreto VIA n. 223 del 11/09/2014 |
Date of application submission: |
22/09/2017 |
Technical assessment starting date: |
02/10/2017 |
Date of the Opinion of the National Technical Commission : |
27/10/2017 |
National Technical Commission Opinion number: |
2540 |
National Technical Commission Opinion outcome: |
Ottemperata |
Determination date: |
10/11/2017 |
Determination number: |
DVA-DEC-2017-0000322 |
Determination outcome: |
Ottemperata |
Responsible of the procedure: |
Carmela Bilanzone - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Screening |
|
3559 |
17/02/2017 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3559 |
Subject
: |
Microtunnel di approdo al tratto italiano del gasdotto Trans Adriatic Pipeline, in ottemperanza alla prescrizione A5) del D.M. 223 del 11/09/2014 |
Date of application submission: |
17/02/2017 |
Publication date of the notice: |
22/02/2017 |
Deadline of submission of Public Comments: |
08/04/2017 |
Technical assessment starting date: |
06/03/2017 |
Date of integrations receipt: |
07/08/2017 |
Republication date of the notice: |
09/08/2017 |
Deadline of submission of Public Comments on the republished project: |
23/09/2017 |
Republication subject
: |
Documentazione integrativa volontaria |
Date of the Opinion of the National Technical Commission : |
02/03/2018 |
National Technical Commission Opinion number: |
2659 |
National Technical Commission Opinion outcome: |
Escluso dalla VIA con prescrizioni |
Determination date: |
09/03/2018 |
Determination number: |
DVA-DEC-2018-0000116 |
Determination outcome: |
Escluso dalla VIA con prescrizioni |
Responsible of the procedure: |
Carmela Bilanzone - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
3471 |
19/10/2016 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3471 |
Subject
: |
Prescrizione A.43 del Decreto VIA n.223 del 11/09/2014 |
Date of application submission: |
19/10/2016 |
Determination date: |
17/01/2018 |
Determination number: |
DVA-DEC-2018-0000025 |
Determination outcome: |
Ottemperata |
Responsible of the procedure: |
Carmela Bilanzone - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
3451 |
16/09/2016 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3451 |
Subject
: |
Prescrizione A.25.b del Decreto VIA n.223 del 11/09/2014 |
Date of application submission: |
16/09/2016 |
Technical assessment starting date: |
10/10/2016 |
Date of integrations receipt: |
11/07/2017 |
Date of the Opinion of the National Technical Commission : |
27/10/2017 |
National Technical Commission Opinion number: |
2538 |
National Technical Commission Opinion outcome: |
Ottemperata |
Determination date: |
09/11/2017 |
Determination number: |
DVA-DEC-2017-0000321 |
Determination outcome: |
Ottemperata |
Responsible of the procedure: |
Carmela Bilanzone - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
3427 |
29/08/2016 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3427 |
Subject
: |
Prescrizione A.11 del Decreto VIA n.223 del 11/09/2014 |
Date of application submission: |
29/08/2016 |
Technical assessment starting date: |
06/09/2016 |
Date of the Opinion of the National Technical Commission : |
27/10/2017 |
National Technical Commission Opinion number: |
2539 |
National Technical Commission Opinion outcome: |
Ottemperata |
Determination date: |
10/11/2017 |
Determination number: |
DVA-DEC-2017-0000324 |
Determination outcome: |
Ottemperata |
Responsible of the procedure: |
Carmela Bilanzone - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
3196 |
13/12/2015 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3196 |
Subject
: |
Prescrizione A.3 del Decreto VIA n. 223 del 11/09/2014 |
Date of application submission: |
13/12/2015 |
Date of request for integrations: |
11/05/2016 |
Date of integrations receipt: |
13/06/2016 |
Date of the Opinion of the National Technical Commission : |
21/04/2017 |
National Technical Commission Opinion number: |
2373 |
National Technical Commission Opinion outcome: |
Ottemperata |
Determination date: |
05/05/2017 |
Determination number: |
DVA-DEC-2017-0000130 |
Determination outcome: |
Ottemperata |
Responsible of the procedure: |
Carmela Bilanzone - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
3207 |
03/12/2015 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3207 |
Subject
: |
Prescrizione A.20 del Decreto VIA n. 223 del 11/09/2014 |
Date of application submission: |
03/12/2015 |
Technical assessment starting date: |
16/12/2015 |
Date of the Opinion of the National Technical Commission : |
16/06/2017 |
National Technical Commission Opinion number: |
2430 |
National Technical Commission Opinion outcome: |
Ottemperata |
Determination date: |
22/06/2017 |
Determination number: |
DVA-DEC-2017-0000197 |
Determination outcome: |
Ottemperata |
Responsible of the procedure: |
Carmela Bilanzone - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
3209 |
03/12/2015 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3209 |
Subject
: |
Prescrizione A.19 del Decreto VIA n. 223 del 11/09/2014 |
Date of application submission: |
03/12/2015 |
Technical assessment starting date: |
16/12/2015 |
Date of the Opinion of the National Technical Commission : |
16/06/2017 |
National Technical Commission Opinion number: |
2431 |
National Technical Commission Opinion outcome: |
Ottemperata |
Determination date: |
22/06/2017 |
Determination number: |
DVA-DEC-2017-0000196 |
Determination outcome: |
Ottemperata |
Responsible of the procedure: |
Carmela Bilanzone - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
Technical opinion |
|
3195 |
18/11/2015 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3195 |
Subject
: |
Modalità di ottemperanza delle prescrizioni ante-operam |
Date of application submission: |
18/11/2015 |
Technical assessment starting date: |
30/11/2015 |
Date of notification to the developer of the procedure outcomes: |
23/12/2015 |
Date of the Opinion of the National Technical Commission : |
18/12/2015 |
National Technical Commission Opinion number: |
1942 |
National Technical Commission Opinion outcome: |
Parere espresso |
Responsible of the procedure: |
Carmela Bilanzone - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
Technical opinion |
|
3208 |
07/11/2015 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3208 |
Subject
: |
Modalità di ottemperanza delle prescrizioni A3) e A5) ante-operam |
Date of application submission: |
07/11/2015 |
Technical assessment starting date: |
27/11/2015 |
Date of notification to the developer of the procedure outcomes: |
23/12/2015 |
Date of the Opinion of the National Technical Commission : |
18/12/2015 |
National Technical Commission Opinion number: |
1943 |
National Technical Commission Opinion outcome: |
Parere espresso |
Responsible of the procedure: |
Carmela Bilanzone - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
3114 |
03/09/2015 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3114 |
Subject
: |
Prescrizione A.4 del Decreto VIA n. 223 del 11/09/2014 |
Date of application submission: |
03/09/2015 |
Determination date: |
26/10/2016 |
Determination number: |
DVA-2016-0026156 |
Determination outcome: |
Ottemperata |
Responsible of the procedure: |
Carmela Bilanzone - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
3115 |
03/09/2015 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3115 |
Subject
: |
Prescrizione A.5 del Decreto VIA n.223 del 11/09/2014 |
Date of application submission: |
03/09/2015 |
Technical assessment starting date: |
03/05/2017 |
Date of integrations receipt: |
19/04/2017 |
Date of second request for integrations : |
21/12/2017 |
Date of the Opinion of the National Technical Commission : |
06/04/2018 |
National Technical Commission Opinion number: |
2703 |
National Technical Commission Opinion outcome: |
Ottemperata |
Determination date: |
16/04/2018 |
Determination number: |
DVA-DEC-2018-0000190 |
Determination outcome: |
Ottemperata |
Notes: |
Il 1 agosto 2018 ed il 2 agosto 2018 il procedimento di Verifica dell'ottemperanza (fascicolo ID_VIP 3115), concluso in data 16/04/2018 con provvedimento DVA-DEC-2018-0000190, è stato visualizzato su questo sito con "Stato procedura: Istruttoria tecnica CTVIA", in quanto, su tale procedimento, benché concluso, è pervenuta di recente della documentazione da parte di ISPRA/ARPA Puglia e del Comitato Ecolabel - Ecoaudit inerente ad alcuni aspetti di ulteriore definizione connessi alla prescrizione A.5 del Decreto VIA DM-0000223 citato. Tali aspetti sono trattati, dal punto di vista informatico, con due sub procedure specifiche per le quali si è richiesto un parere alla CTVIA (fascicoli ID_VIP 4200 e ID_VIP 4199) e gli esiti saranno pubblicati sul Portale non appena disponibili. |
Responsible of the procedure: |
Carmela Bilanzone - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
3120 |
03/09/2015 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3120 |
Subject
: |
Prescrizione A.12 del Decreto VIA n. 223 del 11/09/2014 |
Date of application submission: |
03/09/2015 |
Technical assessment starting date: |
10/09/2015 |
Date of the Opinion of the National Technical Commission : |
02/12/2016 |
National Technical Commission Opinion number: |
2236 |
National Technical Commission Opinion outcome: |
Ottemperata |
Determination date: |
13/01/2017 |
Determination number: |
DVA-DEC-2017-0000004 |
Determination outcome: |
Ottemperata |
Responsible of the procedure: |
Carmela Bilanzone - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
3119 |
03/09/2015 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3119 |
Subject
: |
Prescrizione A.9 del Decreto VIA n. 223 del 11/09/2014 |
Date of application submission: |
03/09/2015 |
Technical assessment starting date: |
18/12/2017 |
Date of notification to the developer of the procedure outcomes: |
20/05/2019 |
Notification Reference number: |
DVA_2019-0012723 |
Outcome: |
Archiviazione istanza |
Notes: |
Nuovo avvio in data 13/12/2017 a seguito della presentazione di documentazione in sostituzione della precedente. |
Responsible of the procedure: |
Carmela Bilanzone - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
3118 |
03/09/2015 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3118 |
Subject
: |
Prescrizione A.6 del Decreto VIA n. 223 del 11/09/2014 |
Date of application submission: |
03/09/2015 |
Technical assessment starting date: |
10/09/2015 |
Date of the Opinion of the National Technical Commission : |
23/03/2018 |
National Technical Commission Opinion number: |
2691 |
National Technical Commission Opinion outcome: |
Ottemperata |
Determination date: |
11/04/2018 |
Determination number: |
DVA-DEC-2018-0000173 |
Determination outcome: |
Ottemperata |
Responsible of the procedure: |
Carmela Bilanzone - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
EIA Compliance |
|
3096 |
12/08/2015 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
3096 |
Subject
: |
Prescrizione A.25.a del Decreto VIA n. 223 del 11/09/2014 |
Date of application submission: |
12/08/2015 |
Technical assessment starting date: |
26/09/2016 |
Date of the Opinion of the National Technical Commission : |
24/02/2017 |
National Technical Commission Opinion number: |
2319 |
National Technical Commission Opinion outcome: |
Ottemperata |
Determination date: |
06/03/2017 |
Determination number: |
DVA-DEC-2017-0000057 |
Determination outcome: |
Ottemperata |
Responsible of the procedure: |
Carmela Bilanzone - tel. 0657225071 - 0657225070 - va-5@mase.gov.it |
Stage of the Procedure: |
Concluded |
Environmental Impact Assessment |
|
1805 |
19/03/2012 |
Concluded |
Procedure details
|
Documents
|
Procedure Code (ID_VIP/ID_MATTM) |
1805 |
Transboundary consultations: |
In data 11/04/2012 il Ministero degli affari esteri ha notificato l'avvio della procedura di VIA all'Albania con richiesta di esprimere il proprio interesse a partecipare alla consultazione transfrontaliera |
EIA-AA integrated Procedure : |
Sì |
Date of application submission: |
19/03/2012 |
Publication date of the notice in newspapers: |
22/03/2012 |
Deadline of submission of Public Comments: |
21/05/2012 |
Technical assessment starting date: |
29/03/2012 |
Date of request for integrations: |
05/04/2012 |
Date of notification to the developer of the procedure outcomes: |
13/09/2019 |
Republication date of the notice in newspapers: |
11/09/2013 |
Deadline of submission of Public Comments on the republished project: |
10/11/2013 |
Republication subject
: |
Studio di Impatto Ambientale e Sociale |
Date of request for integrations for the republished project: |
18/03/2014 |
Second Republication date: |
18/04/2014 |
Deadline of submission of Public Comments - Second republication: |
17/06/2014 |
Second republication subject
: |
Documentazione integrativa |
Date of integrations receipt - Second republication: |
30/04/2014 |
Date of integrations second receipt - Second republication: |
01/07/2014 |
Date of the Opinion of the National Technical Commission : |
29/08/2014 |
National Technical Commission Opinion number: |
1596 |
National Technical Commission Opinion outcome: |
Positivo con prescrizioni |
Date of the EIA Decree: |
11/09/2014 |
EIA Decree number: |
DM-0000223 |
EIA Decree outcome: |
Positivo con prescrizioni |
Notification Reference number: |
DVA_2019-0023100 |
Outcome: |
Positivo con prescrizioni |
Notes: |
Il Provvedimento direttoriale del 23/11/2017 prot. DVA-DEC-2017-0000366 dispone la cessazione dell'avvalimento da parte del Ministero dell'Ambiente e della tutela del territorio e del mare, dell'Ente Vigilante indicato all'art. 2) del D.M. 223 dell'11 settembre 2014 per i compiti a questo assegnati dal medesimo D.M. ai fini della verifica di ottemperanza alla prescrizione A.29) parte 2. Il Provvedimento direttoriale del 18/09/2017 prot DVA-DEC-2017-0000262 dispone la cessazione dell'avvalimento da parte del Ministero dell'Ambiente e della tutela del territorio e del mare degli Enti Vigilanti indicati all'art. 2) del D.M. 223 dell'11 settembre 2014 per le prescrizioni n.A18) parte 1, A18) parte 2; A.23), A.31), A.32), A.41), A.24); A.28) parte 2; A.44) parte 2; A.45) parte 2, A.40) per i compiti loro assegnati dal medesimo D.M. ai fini delle verifiche di ottemperanza alle prescrizioni summenzionate.Il decreto DM-0000072 del 16/04/2015 modifica il quadro prescrittivo del decreto DM-0000223 del 11/09/2014 (la prescrizione A.13 viene considerata superata). |
Stage of the Procedure: |
Concluded |