Environmental Assessments and Authorizations: SEA - EIA - IPPC Permit

You are in:

EIA Compliance: 150 kV overhead double-circuit power transmission line between "Canino Arlena" power line and "Elettrica Tuscania" electrical substation

MATTM - Logo stella

19/12/2023

The EIA compliance determination (DEC-2024-0000026 of 19/12/2023) related to the project "150 kV overhead double-circuit power transmission line between "Canino Arlena" power line and "Elettrica Tuscania" electrical substation" has been issued with a "da non assoggettare a via" outcome.

Go to the project

Download the determination