Environmental Assessments and Authorizations: SEA - EIA - IPPC Permit

You are in:

S.S.106 Jonica: construction of the third Mega-lot from the junction with SS534 (km 365+150) to Roseto Capo Spulico (km 400+000)


General information

Work: S.S.106 Jonica / E90

Project: S.S.106 Jonica: construction of the third Mega-lot from the junction with SS534 (km 365+150) to Roseto Capo Spulico (km 400+000)

Description: The project involves works for the upgrade to B type section, compliant with Ministerial Decree of 5 November 2001, of 38 km of the SS 106 Jonica, as regards the section between the junction with SS 534 of Cammarata e degli Stombi (km 365 +150) and Roseto Capo Spulico (km 400+000). The final project involves variants to the second part of the route that runs through the municipalities of Trebisacce, Albidona, Amendolara, Roseto Capo Spulico, as regards plano-altimetric changes to the section from the Junction of Trebisacce (18 + 700 km) to the junction of Roseto (31 + 800 km) for the reduction of tunnel excavation, and to the section from the Junction of Roseto (31 + 800 km) to the end of intervention (37 + 603 km) with the change to the route of Roseto Tunnel.

Developer: ANAS S.p.A.

Project type: Roads

Other projects related to the same work: Show / Hide

Territories and marine areas

Map

Regions: Calabria

Provinces: Cosenza

Municipalities: Roseto Capo Spulico, Albidona, Cerchiara di Calabria, Cassano all'Ionio, Francavilla Marittima, Trebisacce, Villapiana, Amendolara

Marine areas: None

Select procedure

Procedure Online application code Procedure Code Starting date Stage of the procedure
EIA Follow-up (Strategic works Law 443/2001) 5010 29/11/2019 EIA-SEA Technical Committee's assessment Procedure details Documents
EIA Compliance (Strategic works Law 443/2001) 2661 14/02/2014 Concluded Procedure details Documents
Environmental Impact Assessment (Strategic works Law 443/2001) 2661 14/02/2014 Concluded Procedure details Documents
Environmental Impact Assessment (Strategic works Law 443/2001) 655 09/07/2004 Concluded Procedure details Documents