30/11/2015
The SEA decision (D.M. 252 of 30 November 2015) related to 2014-2020 National Programme for rural development has been issued with favourable outcome.
20/11/2015
The Project Change determination (DVA-DEC-2015-0000417 of 20 November 2015) related to Road link between Marche and Umbria and Quadrilatero di penetrazione. Maxi Lot 2. Sub lots 1.1 and 1.2. Construction sites plan and materials balance. Change of excavated material flow has been issued with favourable outcome.
20/11/2015
The SEA decision (D.M. 247 of 20 November 2015) related to Flood risk Management Plan of the Eastern Alps river basin district has been issued with favourable outcome.
13/11/2015
The EIA decision D.M. 243 of 13 November 2015, amending the prescriptive framework (prescription A.7) of the EIA Decision D.M. 168 of 6 August 2015 related to 380 kV single circuit overhead power line Bisaccia-Deliceto, has been issued.
12/11/2015
The EIA decision (D.M. 240 of 12 November 2015) related to the 2D geophysical survey within the area of the offshore prospecting permit "d1 E.P-.SC", has been issued with unfavourable outcome.
12/11/2015
The EIA decision (D.M. 241 of 12 November 2015) related to the hydroelectric plant of Campolattaro Basin (BN), has been issued with favourable outcome.
09/11/2015
The EIA Screening determination (DVA-DEC-2015-0000398 of 9 November 2015) related to the Updates on the project of the floating storage and regasification terminal "FSRU Toscana" has been issued with partly favourable outcome.
09/11/2015
The Project Change determination (DVA-DEC-2015-0000401 of 9 November 2015) related to HS/AC Milano-Genova railway: third Valico dei Giovi. Bypass linking Campasso Gallery and Voltri Interconnection, has been issued with favourable outcome.
05/11/2015
The EIA compliance determination (DVADEC-2015-0000397 of 5 November 2015) on the prescription 13 of the EIA Screening determination no. 29276 of 3 Dicember 2012 has been issued with unfavourable outcome.
04/11/2015
The EIA compliance determination (DVADEC-2015-0000393 of 4 November 2015) on the prescription A1 of the EIA decision no. 184 of 3 July 2014 has been issued with favourable outcome.