23/09/2015
The EIA compliance determination (DVADEC-2015-0000328 of 23 September 2015) on 50 prescriptions of the EIA decision no. 576 of 28 October 2011 has been issued with partly favourable outcome.
18/09/2015
The EIA compliance determination (DVA-2015-0023514 of 18 September 2015) on the prescription A.6 of the EIA decision no. 437 of 10 August 2012 has been issued with partly favourable outcome.
17/09/2015
The unsubstantial project change determination (DVA-DEC-2015-0000326 of 17 September 2015) related to E78 Grosseto - Fano motorway, section Grosseto-Siena. Extension to four lane of the S.S. 223 from km 30+040 to km 41+600. Lots 5,6,7,8. Variant of reinforced soil walls, has been issued with partly favourable outcome.
14/09/2015
The EIA Follow-up determination - stage 1 (DVA-DEC-2015-0000321 of 14 September 2015) related to the project Railway line HS/HC Milano-Verona: section HS/HC Treviglio- Brescia. Expansion of mining quarry of Covo, has been issued with favourable outcome.
03/09/2015
The EIA compliance determination (DVADEC-2015-0000315 of 3 September 2015) on the prescriptions A1.1, A1.2 of the EIA decision no. 2 of 12 January 2015 has been issued with favourable outcome.
03/09/2015
The EIA compliance determination (DVADEC-2015-0000314 of 3 September 2015) on the prescription A.19 of the EIA decision no. 236 of 8 August 2013 has been issued with favourable outcome.
02/09/2015
The Project Change determination (DVA-DEC-2015-0000311 of 2 September 2015) related to Road link between Marche and Umbria and Quadrilatero di penetrazione. Maxi Lot 2. Sub lot 1.1. Change of Viaduct Gattuccio Sud (VI12), has been issued with favourable outcome.
28/08/2015
The Project Change determination (DVA-DEC-2015-0000089 of 15 April 2015) related to Road link between Marche and Umbria and Quadrilatero di penetrazione. Maxi Lot 1. Sub lot 2.1 Change "Junction of Colfiorito - Stretch H (SV 402)", has been issued with favourable outcome.
28/08/2015
The Project Change determination (DVA-DEC-2015-0000307 of 28 August 2015) related to Road link between Marche and Umbria and Quadrilatero di penetrazione. Maxi Lot 1. Sub lots 1.2 and 2.1 , variation plan construction site, has been issued with favourable outcome.
24/08/2015
The EIA compliance determination (DVADEC-2015-0000302 of 24/08/2015) on the Prescription 2.c of the EIA decision no.18706 of 6 August 2003 has been issued with a favourable outcome.