Environmental Assessments and Authorizations: SEA - EIA - IPPC Permit

You are in:

Construction of the Regional Cispadana Motorway connecting the Reggiolo-Rolo exit to the South Ferrara motorway barrier on the A22

Documents

(n.7689) Documents of the Environmental Impact Assessment

Title Section Code Date Scale Size
COROGRAFIA GENERALE EIA Report - Policy framework 6562-PD-0-D00-D0000-0-IA-CO-01-A 11/10/2012 1:25.000 11297 kB Metadata Download
RACCOLTA DEGLI STRUMENTI DI PIANIFICAZIONE TERRITORIALE E URBANISTICA EIA Report - Policy framework 6563-PD-0-D00-D0000-0-IA-FS-01-A 11/10/2012 varie 76358 kB Metadata Download
SINTESI DELLE PREVISIONI, DELLE TUTELE E DEI VINCOLI SOVRAORDINATI - TAV 1/4 EIA Report - Policy framework 6564-PD-0-D00-D0000-0-IA-CW-01-A 11/10/2012 1:10.000 8572 kB Metadata Download
SINTESI DELLE PREVISIONI, DELLE TUTELE E DEI VINCOLI SOVRAORDINATI - TAV 2/4 EIA Report - Policy framework 6565-PD-0-D00-D0000-0-IA-CW-02-A 11/10/2012 1:10.000 16634 kB Metadata Download
SINTESI DELLE PREVISIONI, DELLE TUTELE E DEI VINCOLI SOVRAORDINATI - TAV 3/4 EIA Report - Policy framework 6566-PD-0-D00-D0000-0-IA-CW-03-A 11/10/2012 1:10.000 6999 kB Metadata Download
SINTESI DELLE PREVISIONI, DELLE TUTELE E DEI VINCOLI SOVRAORDINATI - TAV 4/4 EIA Report - Policy framework 6567-PD-0-D00-D0000-0-IA-CW-04-A 11/10/2012 1:10.000 16089 kB Metadata Download
Elenco elaborati documentazione integrativa Lists of Project documents EE-001 05/08/2013 - 54 kB Metadata Download
Relazione sinottica sulle principali sensibilità dell'interazione opera-ambiente Supplementary documentation REL-01 05/08/2013 - 4919 kB Metadata Download
Relazione generale Supplementary documentation REL-02 05/08/2013 - 13350 kB Metadata Download
Valutazione comparata della infrastruttura nella configurazione di autostrada e di strada a scorrimento veloce - Relazione integrativa Supplementary documentation GEN-1-1-1-1 05/08/2013 - 321209 kB Metadata Download