Environmental Assessments and Authorizations: SEA - EIA - IPPC Permit

You are in:

Integrated and coordinated procedures


 

Projects (263)

Project Developer
380 kV double circuit overhead power line Gissi-Larino-Foggia Terna Rete Elettrica Nazionale S.p.A. info Project documents
"Ripalta Storage" Concession - Expansion of the storage capacity by increasing the maximum operating pressure (Pmax) over the original bottom static pressure (Pi) of the reservoir (Pmax = 1.10 Pi) and the withdrawal peak capacity , through the implementation of a new treatment plant, the drilling of four new wells and the construction of the infrastructures required STOGIT S.p.A. info Project documents
Construction of the Regional Cispadana Motorway connecting the Reggiolo-Rolo exit to the South Ferrara motorway barrier on the A22 Autostrada Regionale Cispadana S.p.A. info Project documents
Redevelopment of the industrial area of Porto Marghera: Ammonia to Liquefied Petroleum Gas conversion of the refrigerated storage plant ENI S.p.A. info Project documents
A5 Torino - Quincinetto Motorway - Ivrea Hydraulic Node - 2nd stage of completion ATIVA SpA info Project documents
Superstrada Pedemontana Veneta - Lot 2 section B from km 29 +300 to km 38 +700 Commissario delegato per l'emergenza determinatasi nel settore del traffico e della mobilità nel territorio delle province di Treviso e Vicenza info Project documents
Superstrada Pedemontana Veneta - Lot 3 section F from km 54+755 to km 55+494 Commissario delegato per l'emergenza determinatasi nel settore del traffico e della mobilità nel territorio delle province di Treviso e Vicenza info Project documents
Valsugana Valbrenta-Bassano route - toll motorway Regione Veneto - Direzione Strade Autostrade e Concessioni info Project documents
Cervignano-Mortara DN 1400 (56") DP 75 bar gas pipeline and connected works SNAM RETE GAS S.p.A. info Project documents
380kV double circuit power line Chiaramonte Gulfi - Ciminna and related works Terna Rete Elettrica Nazionale S.p.A. info Project documents