Notices to the public related to the EIA procedures started after the 16th of May 2017 pursuant to Articles 24 and 27 of Legislative Decree 152/2006 as amended by Legislative Decree 104/2017.
Project | Pubblication date | Deadline for submission of comments | Info | Doc | Download |
---|---|---|---|---|---|
Methane supply network in Sardinia - Northern section | 21/06/2018 | 02/06/2019 | Info and procedures | documents | Download |
33,6 MW Casalvecchio on-shore wind farm and related works | 18/06/2018 | 12/06/2019 | Info and procedures | documents | Download |
32,4 MW Spinazzola on-shore wind farm and related works | 18/06/2018 | 28/07/2023 | Info and procedures | documents | Download |
Rationalization of the high voltage electricity grid in the area of Val Formazza and Interconnector Italy-Switzerland | 25/06/2018 | 24/08/2018 | Info and procedures | documents | Download |
Rationalization of the high voltage electricity grid in the area of Val Formazza and Interconnector Italy-Switzerland | 25/06/2018 | 24/08/2018 | Info and procedures | documents | Download |
Rationalization of the high voltage electricity grid in the area of Val Formazza and Interconnector Italy-Switzerland | 25/06/2018 | 24/08/2018 | Info and procedures | documents | Download |
Rationalization of the high voltage electricity grid in the area of Val Formazza and Interconnector Italy-Switzerland | 25/06/2018 | 24/08/2018 | Info and procedures | documents | Download |
S.S. 21 "della Maddalena" - Variant of Demonte, Aisone and Vinadio - Lot 1 - Variant of Demonte | 14/06/2018 | 27/04/2019 | Info and procedures | documents | Download |
Progetto di potenziamento del parco eolico Partinico-Monreale (PA), per una potenza complessiva di 42,0 MW - Prescrizioni: 1 A, 1 B, 1 MIC, 2 C, 2 MIC, 2A, 2B, 3 B, 3 D, 3 E | 30/05/2018 | 06/04/2019 | Info and procedures | documents | Download |
79,8 MW onshore wind farm Cerignola Veneta Sud (FG) in the municipality of Cerignola (FG) | 30/05/2018 | 06/04/2019 | Info and procedures | documents | Download |