Environmental Assessments and Authorizations: SEA - EIA - IPPC Permit

You are in:

Notices to the public


Notices to the public related to the EIA procedures started after the 16th of May 2017 pursuant to Articles 24 and 27 of Legislative Decree 152/2006 as amended by Legislative Decree 104/2017.

Notices (3439)

Project Pubblication date Deadline for submission of comments
43,2 MW on-shore wind farm in the municipality of Ascoli Satriano (FG) in the locality of Pozzo spagnuolo, Conca d'oro, Tamariceto, Posticchio 22/05/2018 22/12/2019 Info and procedures documents Download
Drilling of the "DONATA 4 DIR" well within the hydrocarbons exploitation concession named B.C3.AS 16/05/2018 09/01/2019 Info and procedures documents Download
43,2 MW onshore wind farm in the municipality Castelluccio dei Sauri (FG) and related infrastructures 10/05/2018 09/07/2018 Info and procedures documents Download
Reconstruction of Ravenna-Chieti natural gas pipeline, Ravenna-Jesi section and related works 11/05/2018 19/03/2020 Info and procedures documents Download
33,6 MW Bovino on-shore wind farm and related works 08/05/2018 07/06/2018 Info and procedures documents Download
42,0 MW onshore wind farm of "Poggio Imperiale" and related infrastructures 24/04/2018 30/12/2018 Info and procedures documents Download
"M. Arlotta" Airport of Taranto-Grottaglie - Master Plan (2030) 20/04/2018 19/06/2018 Info and procedures documents Download
Track-quadrupling of the Fortezza-Verona line southern access to the Brenner Base Tunnel 10/04/2018 29/03/2019 Info and procedures documents Download
Progetto di Potenziamento del parco eolico Mineo-Militello-Vizzini - potenza complessiva di 121,8 MW - Prescrizioni: 1 MIC, 1A, 1B, 2A, 2A MIC, 2B, 2B MIC, 2C, 2C MIC, 2D MIC, 3 MIC, 3A, 3B, 3D, 3E 10/04/2018 06/04/2019 Info and procedures documents Download
E78 Grosseto-Fano motorway - Adaptation to 4 lanes in the Grosseto-Siena section (S.S. 223 "di Paganico") from km 41+600 to km 53+400 - Lot 9 10/04/2018 09/05/2018 Info and procedures documents Download