Technological improvement of the steam recovery system located at the Maritime Terminal of the Refinery ENI Taranto | ENI S.p.A. - Divisione Refining & Marketing | EIA Compliance | info | Project documents |
Fiume Treste Storage Concession: expansion of the storage capacity | STOGIT S.p.A. | EIA Compliance | info | Project documents |
"Ripalta Storage" Concession - Expansion of the storage capacity by increasing the maximum operating pressure (Pmax) over the original bottom static pressure (Pi) of the reservoir (Pmax = 1.10 Pi) and the withdrawal peak capacity , through the implementation of a new treatment plant, the drilling of four new wells and the construction of the infrastructures required | STOGIT S.p.A. | EIA Compliance | info | Project documents |
Construction of the Valle Orco aqueduct | Società Metropolitana Acque Torino S.p.A. | EIA Screening | info | Project documents |
Increasing of the voltage of 132 kV for some electrical power lines in Umbria and Marche region | Terna Rete Italia S.p.A. | EIA Screening | info | Project documents |
Modification to the thermal power plant of Castellanza (VA) | Chemisol Italia S.r.l. | EIA Screening | info | Project documents |
Track-quadrupling of the Fortezza-Verona line southern access to the Brenner Base Tunnel | Italferr S.P.A. | Unsubstantial project changes (Strategic works Law 443/2001) | info | Project documents |
Itinerario Palermo-Agrigento. Tratto Palermo-Lercara: adeguamento della S.S.121 dal nuovo svincolo di Bolognetta (escluso) al bivio di Manganaro e della S.S. 189 dal bivio di Manganaro a Lercara Friddi | ANAS S.p.A. | Unsubstantial project changes (Strategic works Law 443/2001) | info | Project documents |
Florence Airport - Master Plan 2014-2029 | ENAC - Ente Nazionale per l'Aviazione Civile | Environmental Observatory | info | Project documents |
Gas pipeline interconnector to TAP | SNAM RETE GAS S.p.A. | EIA Compliance | info | Project documents |