Notices to the public related to the EIA Screening procedures started before the 16th of May 2017.
Project | Pubblication date | Deadline for submission of comments | Info | Doc | Download |
---|---|---|---|---|---|
Motorway A1 Milan-Naples - Extension of the third lane, section Barberino di Mugello - Firenze Nord - Variant - A1 underpass | 24/11/2014 | 08/01/2015 | Info and procedures | documents | Download |
Structural works of hydraulic safety and supply of drinking water in Gello and Laghi Primavera (PT) | 14/11/2014 | 29/12/2014 | Info and procedures | documents | Download |
Motorway A1 Milan-Naples - Extension of the third lane, section Barberino di Mugello - Firenze Nord - Variant - A1 underpass | 14/11/2014 | 08/01/2015 | Info and procedures | documents | Download |
Modifications to the thermal power plant of Porto Marghera | 24/09/2014 | 08/11/2014 | Info and procedures | documents | Download |
Trino power plant - Updated of radioactive waste and on-site interim storage management mode | 09/09/2014 | 05/03/2015 | Info and procedures | documents | Download |
132 kV power line S.Giuseppe-Portoferraio no.048. Reconstruction of the power line and the new location for pylon no.40. | 12/08/2014 | 26/09/2014 | Info and procedures | documents | Download |
New 150 kV electrical station of Potecorvo and related connections to the National Transmission Grid and new 150 kV power line "E.S. Pontecorvo-E.S. Cassino Smistamento (ex Fiat Serene) - [Location EL-271]" | 11/08/2014 | 25/09/2014 | Info and procedures | documents | Download |
A1 Milano-Napoli motorway. Adaptation of the section crossing the Apennines between Sasso Marconi and Barberino di Mugello - La Quercia-Badia Nuova - Lot 5B Gallery Val di Sambro section - Deep and surface draining activities in Ripoli | 11/08/2014 | 25/09/2014 | Info and procedures | documents | Download |
Infrastructural improvement of the Orte-Falconara railway line - New electrical substation of Albacina - Construction of the HV connection to the 132KV power line Genga-Fossato Dispari managed by RFI | 07/08/2014 | 21/09/2014 | Info and procedures | documents | Download |
Salerno-Reggio Calabria railway line - Speeding up the main lines (upgrading) - Complementary interventions | 01/08/2014 | 14/05/2015 | Info and procedures | documents | Download |