Notices to the public related to the EIA Screening procedures started before the 16th of May 2017.
Project | Pubblication date | Deadline for submission of comments | Info | Doc | Download |
---|---|---|---|---|---|
150 kV overhead single circuit power line Rotello electrical substation- Rotello Smistamento | 23/12/2015 | 06/05/2016 | Info and procedures | documents | Download |
Turin-Savona A6 motorway - Adaptation of the junction of Niella Tanaro | 22/12/2015 | 05/02/2016 | Info and procedures | documents | Download |
Adaptation of S.S. 131 Carlo Felice highway. Lot from Monastir (km 23+300) to Sanluri (km 47+000) | 15/12/2015 | 29/01/2016 | Info and procedures | documents | Download |
Conditioning of aqueous liquid waste stored in the Plutonio (IPU) plant of Casaccia | 09/12/2015 | 23/01/2016 | Info and procedures | documents | Download |
220/150 kV electrical substation of Montesano and overhead/underground power line connections to the National transmission grid | 02/12/2015 | 16/01/2016 | Info and procedures | documents | Download |
Naples Capodichino Airport - Master Plan | 24/11/2015 | 08/01/2016 | Info and procedures | documents | Download |
Motorway A1 Milan-Naples. Extension to third lane for the section Barberino di Mugello- Firenze Nord. Construction site CA08 - Provisional raised road Baccheraia | 19/11/2015 | 03/01/2016 | Info and procedures | documents | Download |
Port of Olbia - Construction of a dock for mooring of fish boats serving the storage and processing of the fish | 27/10/2015 | 11/12/2015 | Info and procedures | documents | Download |
Start-up of bio-fuels production at the Gela Refinery (G2 Project) | 11/08/2015 | 25/09/2015 | Info and procedures | documents | Download |
Port of Naples - Adaptation of east dock into container terminal by reclaiming of the dock and connecting works | 10/08/2015 | 24/09/2015 | Info and procedures | documents | Download |