The EIA Follow-up, which concludes the impact assessment of strategic projects of major national interest, consists of PHASE 1, aimed at verifying the adequacy of the final construction design to the final draft and the compliance with the prescriptions laid down regarding the design aspects, and PHASE 2, aimed at monitoring the environmental effects of the project and at fulfilling the prescriptions to be implemented during the construction and operation phases.
During the two phases more decisions can be issued.
Project | Developer | Date and number | Outcome | Info | Doc | download |
---|---|---|---|---|---|---|
HS/HC Milano-Genova "Terzo Valico dei Giovi" railway | Consorzio COCIV | 29/12/2016 DVA-DEC-2016-0000475 |
Positivo | Info Project and procedures | documents | Download |
Itinerario Agrigento-Caltanissetta A19: adeguamento a 4 corsie della S.S.640 di Porto Empedocle nel tratto dal km 9+800 al km 44+400 | ANAS S.p.A. | 29/12/2016 DVA-DEC-2016-0000473 |
Positivo | Info Project and procedures | documents | Download |
Brenner Base Tunnel | Galleria di Base del Brennero Brenner Basistunnel BBT-SE | 04/11/2016 DVA-DEC-2016-0000377 |
Positivo | Info Project and procedures | documents | Download |
Brenner Base Tunnel | Galleria di Base del Brennero Brenner Basistunnel BBT-SE | 28/10/2016 DVA-DEC-2016-0000369 |
Positivo | Info Project and procedures | documents | Download |
Itinerario Agrigento - Caltanissetta - A19 SS640 di Porto Empedocle. Ammodernamento ed adeguamento alla cat.B del D.M.05.11.2001 - 2° tratto dal km44+000 allo svincolo con la A19. | ANAS S.p.A. | 19/10/2016 DVA-DEC-2016-0000346 |
Positivo | Info Project and procedures | documents | Download |
S.S.675 umbro-laziale ex raccordo Civitavecchia-Orte - Tratto tra la S.P. Tuscanese ed il Km. 84+450 della S.S.1 Aurelia | ANAS S.p.A. Compartimento della Viabilità per il Lazio | 17/10/2016 DVA-DEC-2016-0000341 |
Positivo | Info Project and procedures | documents | Download |
Brenner Base Tunnel | Galleria di Base del Brennero Brenner Basistunnel BBT-SE | 06/10/2016 DVA-DEC-2016-0000294 |
Positivo | Info Project and procedures | documents | Download |
Asse Viario Marche Umbria e quadrilatero di penetrazione interna: SS. 77 Val di Chienti: Foligno-Pontelatrave; Allaccio S.S.77 - S.S. 3 a Foligno; Pedemontana Fabriano - Muccia | Quadrilatero Marche - Umbria S.p.A. | 05/10/2016 DVA-DEC-2016-0000284 |
Positivo | Info Project and procedures | documents | Download |
New system of outer bypass in Milan: Milan outer eastern bypass | Concessioni Autostradali Lombarde S.p.A. | 07/07/2016 DVA-DEC-2016-0000260 |
Positivo | Info Project and procedures | documents | Download |
Railway Palermo-Catania - Catenanuova - Raddusa Agira route | Italferr S.P.A. | 05/07/2016 DVA-DEC-2016-0000258 |
Positivo | Info Project and procedures | documents | Download |