Environmental Assessments and Authorizations: SEA - EIA - IPPC Permit

You are in:

EIA follow-up Determinations - art.185 Legislative Decree 163/2006 - Strategic works Law 443/2001


The EIA Follow-up, which concludes the impact assessment of strategic projects of major national interest, consists of PHASE 1, aimed at verifying the adequacy of the final construction design to the final draft and the compliance with the prescriptions laid down regarding the design aspects, and PHASE 2, aimed at monitoring the environmental effects of the project and at fulfilling the prescriptions to be implemented during the construction and operation phases.
During the two phases more decisions can be issued.

     

Results (160)

Project Developer Date and number Outcome
Itinerario Agrigento - Caltanissetta - A19 SS640 di Porto Empedocle. Ammodernamento ed adeguamento alla cat.B del D.M.05.11.2001 - 2° tratto dal km44+000 allo svincolo con la A19. ANAS S.p.A. 14/03/2018
DVA-DEC-2018-0000119
Positivo Info Project and procedures documents Download
Brenner Base Tunnel Galleria di Base del Brennero Brenner Basistunnel BBT-SE 05/03/2018
DVA-DEC-2018-0000104
Positivo Info Project and procedures documents Download
Raccordo autostradale Autostrada della Cisa A15-Autostrada del Brennero A22 Fontevivo(PR)-Nogarole Rocca(VR) Società Autocamionale della CISA S.p.A. 19/02/2018
DVA-DEC-2018-0000079
Positivo Info Project and procedures documents Download
Asse Viario Marche Umbria e quadrilatero di penetrazione interna: SS. 77 Val di Chienti: Foligno-Pontelatrave; Allaccio S.S.77 - S.S. 3 a Foligno; Pedemontana Fabriano - Muccia Quadrilatero Marche - Umbria S.p.A. 13/02/2018
DVA-DEC-2018-0000068
Positivo Info Project and procedures documents Download
Progetto di adeguamento a quattro corsie per la strada di grande comunicazione Grosseto, Siena, Arezzo, Fano - Tronco Grosseto - Siena ANAS S.p.A. 16/01/2018
DVA-DEC-2018-0000015
Positivo Info Project and procedures documents Download
Lavori di ammodernamento in nuova sede della S.S.106 Jonica: tratto Palizzi (Km 50+00)-Caulonia (Km 123+800), Lotti 6-7-8 compreso lo svincolo di Marina di Gioiosa Jonica - 1° Megalotto ANAS S.p.A. 01/12/2017
DVA-DEC-2017-0000396
Positivo Info Project and procedures documents Download
Itinerario Agrigento-Caltanissetta A19: adeguamento a 4 corsie della S.S.640 di Porto Empedocle nel tratto dal km 9+800 al km 44+400 ANAS S.p.A. 17/10/2017
DVA-DEC-2017-0000292
Positivo Info Project and procedures documents Download
Nuovo collegamento Palermo-Catania - Raddoppio della tratta Bicocca-Catenanuova Italferr S.P.A. 26/09/2017
DVA-DEC-2017-0000272
Positivo Info Project and procedures documents Download
Itinerario Agrigento - Caltanissetta - A19 SS640 di Porto Empedocle. Ammodernamento ed adeguamento alla cat.B del D.M.05.11.2001 - 2° tratto dal km44+000 allo svincolo con la A19. ANAS S.p.A. 21/09/2017
DVA-DEC-2017-0000264
Positivo Info Project and procedures documents Download
Napoli-Bari railway line. Doubling track Cancello-Benevento - I Lot Cancello-Frasso Telesino and Variant to historical Rome-Naples railway via Cassino in the Municipality of Maddaloni Italferr S.p.A. 18/09/2017
DVA-DEC-2017-0000260
Positivo Info Project and procedures documents Download