The EIA Follow-up, which concludes the impact assessment of strategic projects of major national interest, consists of PHASE 1, aimed at verifying the adequacy of the final construction design to the final draft and the compliance with the prescriptions laid down regarding the design aspects, and PHASE 2, aimed at monitoring the environmental effects of the project and at fulfilling the prescriptions to be implemented during the construction and operation phases.
During the two phases more decisions can be issued.
Project | Developer | Date and number | Outcome | Info | Doc | download |
---|---|---|---|---|---|---|
Itinerario Agrigento - Caltanissetta - A19 SS640 di Porto Empedocle. Ammodernamento ed adeguamento alla cat.B del D.M.05.11.2001 - 2° tratto dal km44+000 allo svincolo con la A19. | ANAS S.p.A. | 14/03/2018 DVA-DEC-2018-0000119 |
Positivo | Info Project and procedures | documents | Download |
Brenner Base Tunnel | Galleria di Base del Brennero Brenner Basistunnel BBT-SE | 05/03/2018 DVA-DEC-2018-0000104 |
Positivo | Info Project and procedures | documents | Download |
Raccordo autostradale Autostrada della Cisa A15-Autostrada del Brennero A22 Fontevivo(PR)-Nogarole Rocca(VR) | Società Autocamionale della CISA S.p.A. | 19/02/2018 DVA-DEC-2018-0000079 |
Positivo | Info Project and procedures | documents | Download |
Asse Viario Marche Umbria e quadrilatero di penetrazione interna: SS. 77 Val di Chienti: Foligno-Pontelatrave; Allaccio S.S.77 - S.S. 3 a Foligno; Pedemontana Fabriano - Muccia | Quadrilatero Marche - Umbria S.p.A. | 13/02/2018 DVA-DEC-2018-0000068 |
Positivo | Info Project and procedures | documents | Download |
Progetto di adeguamento a quattro corsie per la strada di grande comunicazione Grosseto, Siena, Arezzo, Fano - Tronco Grosseto - Siena | ANAS S.p.A. | 16/01/2018 DVA-DEC-2018-0000015 |
Positivo | Info Project and procedures | documents | Download |
Lavori di ammodernamento in nuova sede della S.S.106 Jonica: tratto Palizzi (Km 50+00)-Caulonia (Km 123+800), Lotti 6-7-8 compreso lo svincolo di Marina di Gioiosa Jonica - 1° Megalotto | ANAS S.p.A. | 01/12/2017 DVA-DEC-2017-0000396 |
Positivo | Info Project and procedures | documents | Download |
Itinerario Agrigento-Caltanissetta A19: adeguamento a 4 corsie della S.S.640 di Porto Empedocle nel tratto dal km 9+800 al km 44+400 | ANAS S.p.A. | 17/10/2017 DVA-DEC-2017-0000292 |
Positivo | Info Project and procedures | documents | Download |
Nuovo collegamento Palermo-Catania - Raddoppio della tratta Bicocca-Catenanuova | Italferr S.P.A. | 26/09/2017 DVA-DEC-2017-0000272 |
Positivo | Info Project and procedures | documents | Download |
Itinerario Agrigento - Caltanissetta - A19 SS640 di Porto Empedocle. Ammodernamento ed adeguamento alla cat.B del D.M.05.11.2001 - 2° tratto dal km44+000 allo svincolo con la A19. | ANAS S.p.A. | 21/09/2017 DVA-DEC-2017-0000264 |
Positivo | Info Project and procedures | documents | Download |
Napoli-Bari railway line. Doubling track Cancello-Benevento - I Lot Cancello-Frasso Telesino and Variant to historical Rome-Naples railway via Cassino in the Municipality of Maddaloni | Italferr S.p.A. | 18/09/2017 DVA-DEC-2017-0000260 |
Positivo | Info Project and procedures | documents | Download |