Environmental Assessments and Authorizations: SEA - EIA - IPPC Permit

You are in:

EIA follow-up Determinations - art.185 Legislative Decree 163/2006 - Strategic works Law 443/2001


The EIA Follow-up, which concludes the impact assessment of strategic projects of major national interest, consists of PHASE 1, aimed at verifying the adequacy of the final construction design to the final draft and the compliance with the prescriptions laid down regarding the design aspects, and PHASE 2, aimed at monitoring the environmental effects of the project and at fulfilling the prescriptions to be implemented during the construction and operation phases.
During the two phases more decisions can be issued.

     

Results (174)

Project Developer Date and number Outcome
Linea AV/AC Torino - Venezia, Tratta Milano - Verona, Lotto funzionale Brescia est - Verona" - Lotto costruttivo 2 Consorzio Eni Per l'Alta Velocità CEPAV Due 25/01/2024
MASE_VA_DEC_2024-0000031
Concluso Info Project and procedures documents Download
Brenner Base Tunnel Galleria di Base del Brennero 14/11/2023
DEC_2023-0000562
Concluso Info Project and procedures documents Download
Adaptation and safety of S.S. 131 Carlo Felice highway from km 108+300 to km 209+500. Resolution critical issues. Stage 1 and 2 ANAS S.p.A. 02/11/2023
02/11/2023
Parzialmente ottemperata Info Project and procedures documents Download
Accessibilità Malpensa: collegamento stradale in variante alla S.S.341 tra Samarate ed il confine con la Provincia di Novara - Tratto compreso tra l'Autostrada A8 (bretella di Gallarate) e la S.S.527 in Comune di Vanzaghello ANAS S.p.A. 10/10/2023
DEC-2023-0000492
Positivo Info Project and procedures documents Download
S.S. n.1 "Aurelia"- Viabilità di accesso all' hub portuale di La Spezia - Variante alla S.S.1 "Aurelia" 3° lotto tra Felettino ed il raccordo autostradale ANAS S.p.A. 28/09/2023
MASE_VA_DEC_2023-0000445
Positivo Info Project and procedures documents Download
High speed road between Milan and Brescia Concessioni Autostradali Lombarde S.p.A. 14/08/2023
MASE-VA-DEC-2023-0000391
Positivo Info Project and procedures documents Download
s.s.38 "dello Stelvio". Accessibilità Valtellina. Lotto 4:nodo di Tirano. Tratta "A" (svincolo di Bianzone - svincolo la Ganda) e tratta "B" (svincolo la Ganda-Campone in Tirano). Progetto Esecutivo. ANAS S.p.A. 27/07/2023
MASE-VA-DEC-2023-0000365
Positivo Info Project and procedures documents Download
Itinerario Napoli Bari - Raddoppio tratta Cancello-Benevento - II lotto funzionale Frasso Telesino-Vitulano (BN) ITALFERR S.p.A 11/07/2023
MASE-VA-DEC-2023-0000329
Positivo Info Project and procedures documents Download
Itinerario Napoli Bari - Raddoppio tratta Cancello-Benevento - II lotto funzionale Frasso Telesino-Vitulano (BN) ITALFERR S.p.A 05/06/2023
MASE-VA-DEC-2023-0000278
Positivo Info Project and procedures documents Download
V.O. Nuovo collegamento ferroviario Torino-Lione , parte comune italo-francese, tratta in territorio italiano Lyon Turin Ferroviaire 05/05/2023
MASE_VA_DEC_2023-0000227
Concluso Info Project and procedures documents Download