The EIA Follow-up, which concludes the impact assessment of strategic projects of major national interest, consists of PHASE 1, aimed at verifying the adequacy of the final construction design to the final draft and the compliance with the prescriptions laid down regarding the design aspects, and PHASE 2, aimed at monitoring the environmental effects of the project and at fulfilling the prescriptions to be implemented during the construction and operation phases.
During the two phases more decisions can be issued.
Project | Developer | Date and number | Outcome | Info | Doc | download |
---|---|---|---|---|---|---|
High speed road between Milan and Brescia | ANAS S.p.A. | 14/02/2020 DET12 |
Non ottemperata | Info Project and procedures | documents | Download |
V.O. Nuovo collegamento ferroviario Torino-Lione , parte comune italo-francese, tratta in territorio italiano | Lyon Turin Ferroviaire | 14/02/2020 DET10 |
Positivo | Info Project and procedures | documents | Download |
Nodo di Bari: Bari Sud (Tratta Bari Centrale - Bari Torre a Mare). | ITALFERR S.p.A | 30/12/2019 DM 455 |
Positivo | Info Project and procedures | documents | Download |
Linea ferroviaria Bari-Taranto: raddoppio della tratta Bari S. Andrea-Bitetto | Italferr S.P.A. | 19/12/2019 DEC - 447 |
Positivo | Info Project and procedures | documents | Download |
Itinerario Agrigento - Caltanissetta - A19 SS640 di Porto Empedocle. Ammodernamento ed adeguamento alla cat.B del D.M.05.11.2001 - 2° tratto dal km44+000 allo svincolo con la A19. | ANAS S.p.A. | 17/12/2019 DEC 436 |
Positivo | Info Project and procedures | documents | Download |
Autostrada Salerno - Reggio Calabria. Lavori di ammodernamento e di adeguamento al tipo 1/a delle Norme C.N.R./80 del tratto compreso tra il km 411+400 ed il km 442+920 | ANAS S.p.A. | 05/12/2019 DEC 420 |
Positivo | Info Project and procedures | documents | Download |
V.O. Nuovo collegamento ferroviario Torino-Lione , parte comune italo-francese, tratta in territorio italiano | Lyon Turin Ferroviaire | 21/11/2019 DEC 369 |
Positivo | Info Project and procedures | documents | Download |
HS/HC Milano-Genova "Terzo Valico dei Giovi" railway | Consorzio COCIV | 21/11/2019 DEC 367 |
Positivo | Info Project and procedures | documents | Download |
Asse Viario Marche Umbria e quadrilatero di penetrazione interna: SS. 77 Val di Chienti: Foligno-Pontelatrave; Allaccio S.S.77 - S.S. 3 a Foligno; Pedemontana Fabriano - Muccia | Quadrilatero Marche - Umbria S.p.A. | 21/10/2019 DEC 373 |
Positivo | Info Project and procedures | documents | Download |
Autostrada Salerno-Reggio Calabria: lavori di ammodernamento ed adeguamento al tipo 1/a delle norme CNR/80 Macrolotto 2 dal Km 108+000 al Km 139+000 - Lotti unificati 1-2-3-4-5 | ANAS S.p.A. | 30/08/2019 DVA-DEC-2019-0000291 |
Positivo | Info Project and procedures | documents | Download |