Project Developer Date and number Outcome
Small size LNG storage, regasification and distribution terminal in the port of Monfalcone and related works Smart Gas S.p.A. 29/03/2017
DM 0000074
Negativo Info Project and procedures documents Download
Adaptation of the cogeneration plant of Taranto ENI S.p.A. 29/03/2017
DM 0000075
Positivo Info Project and procedures documents Download
Pipeline to import natural gas from Algeria to Italy via Sardinia GALSI S.p.A. 14/03/2017
DM 0000057
Positivo Info Project and procedures documents Download
Geothermal pilot power plant named Montenero in the municipality of Castel del Piano (Grosseto) Gesto Italia S.r.l. 14/03/2017
DM 0000056
Positivo Info Project and procedures documents Download
Minerbio Storage Concession - Expansion of the storage capacity by increasing the maximum operating pressure (pmax) as well as the original static bottom pressure (pi) of the reservoir (pmax = 1.07 pi) STOGIT S.p.A. 14/03/2017
DM 0000055
Positivo Info Project and procedures documents Download
Reorganization of the high voltage electrical grid in the metropolitan area of Rome - Northwest Quadrant Terna Rete Elettrica Nazionale S.p.A. 23/02/2017
DVA-2017-0004268
Archiviata Info Project and procedures documents Download
New 150kV double circuit power line Troia electrical substation - Roseto/Alberona electrical substation Terna Rete Elettrica Nazionale S.p.A. 07/02/2017
DVA-2017-0002726
Archiviata Info Project and procedures documents Download
3D geophysical regional survey within the area of the offshore prospecting permit "d1 C.P-.SC" Schlumberger Italiana S.p.a. 05/12/2016
DM 0000356
Negativo Info Project and procedures documents Download
Oil and gas hydrocarbons exploration permit "Zanza" Northsun Italia S.p.A. 11/11/2016
DVA-2016-0027441
Archiviata Info Project and procedures documents Download
Thermal power plant of Ponti sul Mincio - Conversion of the chimney into lookout tower and Mincio Park entrance as a change to the prescription of the EIA Screening determination no. 3479 of 25/03/2002 concerning the conversion to combined cycle of group 2 A2A S.p.A. e AGSM Verona S.p.A. 28/10/2016
DM 0000300
Positivo Info Project and procedures documents Download