Environmental Assessments and Authorizations: SEA - EIA - IPPC Permit

You are in:

EIA Compliance Determinations (starting from January 2013)


     

Results (1253)

Project Developer Date and number Outcome
Elettrodotto a 380 kV in doppia terna Sorgente-Rizziconi Terna Rete Italia S.p.A. 18/05/2017
DVA-DEC-2017-0000151
Ottemperata Info Project and procedures documents Download
Autostrada A8 Milano-Laghi: ampliamento alla quinta corsia nel tratto barriera Milano nord-Interconnessione di Lainate Autostrade per l'Italia S.p.A. 16/05/2017
DVA-DEC-2017-0000148
Parzialmente ottemperata Info Project and procedures documents Download
Modifications to the IGCC plant - Changing the CCPP natural gas combined cycle of the industrial site of Falconara Marittima (AN) Api Energia S.p.A. 16/05/2017
DVA-2017-0011502
Ottemperata Info Project and procedures documents Download
Natural gas storage plant as a part of hydrocarbons onshore storage cencession of San Potito and Cotignola Edison Stoccaggio S.p.A. 15/05/2017
DVA-DEC-2017-0000146
Ottemperata Info Project and procedures documents Download
Installation of a new turbo-compressor (TC7) inside the existing gas storage plant, located in the municipality of Minerbio, related to Minerbio Storage Concession. STOGIT S.p.A. 08/05/2017
DVA-DEC-2017-0000131
Ottemperata Info Project and procedures documents Download
Heavy oil gasification plant and electricity production with cogeneration system in the ISAB refinery of Priolo Gargallo (SR) ISAB Energy S.r.l. 05/05/2017
DVA-DEC-2017-0000129
Ottemperata Info Project and procedures documents Download
Trans Adriatic Pipeline - Albania-Italy pipeline Trans Adriatic Pipeline AG 05/05/2017
DVA-DEC-2017-0000130
Ottemperata Info Project and procedures documents Download
Centrale a ciclo combinato della potenza elettrica di circa 750 MW in comune di Aprilia (LT) in località Campo di Carne Energia S.p.A. 04/05/2017
DVA-DEC-2017-0000121
Ottemperata Info Project and procedures documents Download
Modifications to the IGCC plant - Changing the CCPP natural gas combined cycle of the industrial site of Falconara Marittima (AN) Api Energia S.p.A. 02/05/2017
DVA-2017-0010075
Ottemperata Info Project and procedures documents Download
Progetto del nuovo PRP Piano Regolatore Portuale del Porto di Anzio Capo d'Anzio SpA 02/05/2017
DVA-DEC-2017-0000116
Ottemperata Info Project and procedures documents Download